首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach
Authors:Parisa Shahnazari-Shahrezaei  Reza Tavakkoli-Moghaddam  Hamed Kazemipoor
Institution:1. Department of Industrial Engineering, Firoozkooh Branch, Islamic Azad University, Firoozkooh, Iran;2. Department of Industrial Engineering and Center of Excellence for Intelligence Based Experimental Mechanics, College of Engineering, University of Tehran, Tehran, Iran;3. Department of Industrial Engineering, Parand Branch, Islamic Azad University, Parand, Iran
Abstract:Manpower scheduling is an intricate problem in production and service environments with the purpose of generating fair schedules that consider employers’ objectives and employees’ preferences as much as possible. However, sometimes, vagueness of information related to employers’ objectives and employees’ preferences leads to the fuzzy nature of the problem. This paper presents a multi-objective manpower scheduling model regarding the lack of clarity on the target values of employers’ objectives and employees’ preferences. Hence, a fuzzy goal programming model is developed for the presented model. Afterwards, two fuzzy solution approaches are used to convert the fuzzy goal programming model to two single-objective models. Finally, the results obtained by both single-objective models are compared with each other to select the solution that has the greatest degree of the satisfaction level of employers’ objectives and employees’ preferences.
Keywords:Multi-skilled manpower scheduling  Multi-objective model  Fuzzy goal programming
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号