首页 | 本学科首页   官方微博 | 高级检索  
     检索      

油田开发规划措施结构优化模型及其应用
引用本文:谢祥俊,刘志斌,杜玉洪,田克中.油田开发规划措施结构优化模型及其应用[J].西南石油大学学报(自然科学版),2004,26(2):11-14.
作者姓名:谢祥俊  刘志斌  杜玉洪  田克中
作者单位:(1.西南石油学院计算机科学学院,四川南充637001; 2.中国石油华北油田分公司)
摘    要:利用功能模拟原理(微分模拟方法及神经网络方法)建立的油田开发指标关联关系,对采油厂或开发单元研究并建立了油田措施产量最大(定措施工作量、定措施费用)、措施费用最低(定措施产量、定措施工作量)、措施效益最好(定措施工作量、定措施产量、定措施费用)的措施结构优化模型。这些优化模型成功地解决了油田(或采油厂)各项措施产量(通常包括压裂、酸化、大修以及其它措施等)及对应的各项工作量及其它开发指标的最优构成问题,将模型应用于国内某中后期开发油田的开发规划中产生了较好的经济效益。

关 键 词:开发规划  措施结构  措施费用  效益  优化模型  
收稿时间:2003-01-21

THE MODELLING AND APPLICATION OF PLANNING MEASUREMENT AND STRUCTURE OPTIMATION OF OILFIELD PRODUCTION
XIE Xian-jun,LIUZhi-bin DUYu-hong et al..THE MODELLING AND APPLICATION OF PLANNING MEASUREMENT AND STRUCTURE OPTIMATION OF OILFIELD PRODUCTION[J].Journal of Southwest Petroleum University(Seience & Technology Edition),2004,26(2):11-14.
Authors:XIE Xian-jun  LIUZhi-bin DUYu-hong
Institution:(Southwest Petroleum Institute, Chengdu Sichuan 610500, China)
Abstract:The correlative relationship of the development index of oilfield can be established by use of functional simulation theory(such as differential simulation method and NN method), the authors re-searched the oilfield(oil production plant or development unit) and set up the optimal models of measure structure with different goals,including maximum measure oil-output(fixed measure workload ,fixed measure cost);minimum measure cost(fixed measure oil-out-put,fixed measure workload) and maximum economic benefit(fixed measure workload, fixed measure oil-output, fixed measure cost),which solved the optimal structure problems successfully with each subentry measure oil-output (usually contained fracture oil-output、acidification oil-output、overhaul oil-output、other measure oil-output and so on) and the corresponding measure workload and other de-velopment index of oilfield (or oil production plant). The satisfacto-ry economic benefit can be obtained that applied the models into de-velopment programming in some oilfield, which was in the mid-late stage.
Keywords:development programming  measure structure  measure cost  economic benefit  optimal model  
点击此处可从《西南石油大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《西南石油大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号