Two-Stage Flowshop Scheduling Problem with Bicriteria |
| |
Authors: | Chandrasekharan Rajendran |
| |
Institution: | 1.Indian Institute of Technology,India |
| |
Abstract: | The two-stage flowshop scheduling problem with the objective of minimizing total flowtime subject to obtaining the optimal makespan is discussed. A branch-and-bound algorithm and two heuristic algorithms have been developed. The results of the experimental investigation of the effectiveness of the algorithms are also presented. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |