首页 | 本学科首页   官方微博 | 高级检索  
     


Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make-to-Order Companies
Authors:L. C. Hendry  B. G. Kingsman
Affiliation:1.Department of Operational Research and Operations Management,University of Lancaster,
Abstract:The authors are currently developing a hierarchical production planning system specifically designed for the ‘make-to-order’ sector of industry. Its aim is to control the delivery and manufacturing lead times of all orders processed by a firm. Two major decision levels are identified - the customer enquiry stage and the order release stage. Input/output control is exercised at both stages. This paper is concerned with the control mechanisms used at the customer enquiry stage. Two important backlogs of work, along with their associated backlog lengths, are identified. The system aims to maintain these backlogs between predetermined minimum and maximum lengths in order to process all orders within an acceptable length of time. It is shown that the two backlogs are linked in a manner that enables them to be controlled simultaneously. Hence, a procedure for dealing with incoming customer orders is presented.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号