The DESIR facility at SPIRAL2 |
| |
Authors: | Bertram Blank |
| |
Affiliation: | 1.Centre d’Etudes Nucléaires de Bordeaux-Gradignan, UMR 5795,Université Bordeaux I-IN2P3/CNRS,Gradignan Cedex,France |
| |
Abstract: | The DESIR Collaboration proposes the construction of an experimental facility to exploit the low-energy beams from SPIRAL1, SPIRAL2 and S3. The high degree of purity required to push experiments towards the limits of stability will be achieved by the implementation in the SPIRAL2 production building of a high-efficiency RFQ cooler coupled to a high-resolution mass separator. Beams from the low-energy branch of the separator spectrometer S3 and from SPIRAL1 will allow complementary studies of refractory elements produced by means of fusion reactions as well as of light and intense exotic beams, respectively. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|