A priority-rule method for project scheduling with work-content constraints
Authors:C.-U. Fü  ndeling,N. Trautmann
Affiliation:Departement Betriebswirtschaftslehre, Universität Bern, Schützenmattstrasse 14, 3012 Berne, Switzerland
Abstract:The activities of a project are in general characterized by a work content in terms of resource–time units, e.g. person-days. Even though most project scheduling models assume a time-invariant resource usage, normally it is possible to vary the resource usage during the execution of an activity. Typically, a lower and an upper bound on this resource usage and a minimum time lag between consecutive changes of this resource usage are prescribed. The project scheduling problem studied in this paper consists in determining a feasible resource-usage profile for each activity such that the project duration is minimized subject to precedence and resource-capacity constraints. While the known solution methods interpret the prescribed work content as a lower bound, we assume that each activity’s work content must be processed exactly.
Keywords:Project scheduling   Variable resource usage   Work content   Priority-rule method
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号