首页 | 本学科首页   官方微博 | 高级检索  
     

基于决策树方法的水库跨流域引水调度规则研究
引用本文:习树峰,彭勇,梁国华,王本德,谢志高,李学森. 基于决策树方法的水库跨流域引水调度规则研究[J]. 大连理工大学学报, 2012, 52(1): 74-78
作者姓名:习树峰  彭勇  梁国华  王本德  谢志高  李学森
作者单位:1. 大连理工大学水利工程学院,辽宁大连,116024
2. 深圳市大鹏半岛水源工程管理处,广东深圳,518008
3. 大连理工大学水利工程学院,辽宁大连116024/辽宁省汤河水库管理局,辽宁辽阳111000
基金项目:国家自然科学基金资助项目
摘    要:目前跨流域引水调度属于常规引水规划调度方式,没有考虑实时信息.利用数据挖掘技术中的决策树方法将水库当前的气象预报信息和下垫面蓄水状态、水库多年的实际运行情况等资料与水库管理者的实际调度经验相结合,提出跨流域引水水库的实时调度规则.研究分三步,即首先选取旬初库水位、GFS预报与实际降雨量,旬前土壤含水状态,以及跨流域引水量等资料构成水库调度数据集;然后利用数据挖掘技术从中提取跨流域引水调度决策树;最后对调度决策树进行检验获取跨流域引水水库实时调度规则.实例计算结果表明,采用决策树跨流域引水调度规则进行水库引水调度,可提高水资源利用效率,增加水库综合效益.研究成果对跨流域引水水库实时调度的深入研究与应用有参考价值.

关 键 词:跨流域引水  调度规则  数据挖掘  决策树  GFS预报降雨量

Research on reservoir operation rules of inter-basin water transfer based on decision tree method
XIKGShufeng,KGPENGKGYong,KGLIANGKGGuohu,KGWANGKGBende,KGXIEKGZhigao,KGLIKGXuesen. Research on reservoir operation rules of inter-basin water transfer based on decision tree method[J]. Journal of Dalian University of Technology, 2012, 52(1): 74-78
Authors:XIKGShufeng  KGPENGKGYong  KGLIANGKGGuohu  KGWANGKGBende  KGXIEKGZhigao  KGLIKGXuesen
Affiliation:1,31.School of Hydraulic Engineering,Dalian University of Technology,Dalian 116024,China; 2.Dapeng Half Island Administrative Office of Water Source Engineering,Shenzhen 518008,China; 3.Tanghe Reservoir Management Bureau of Liaoning Province,Liaoyang 111000,China
Abstract:The inter-basin water transfer operation belongs to the conventional water transfer planning operation mode,and the real-time information is not considered in the operation.To solve this problem,the decision tree method in data mining is used combining the current reservoir forecast information,underlaying surface water storage condition,perennial reservoir running situation and other data with the reservoir managers’ actual operation experiences,and then,the inter-basin water transfer real-time operation rules can be realized.Research process has three steps.Firstly,initial reservoir water level,actual rainfall,GFS forecasting rainfall,soil moisture,diversion water quantity,etc.are selected to compose the reservoir operation data set.Secondly,the inter-basin water transfer operation decision tree is extracted by using data mining technology.Finally,the operation decision tree is tested and the inter-basin water transfer real-time operation rules are obtained.The actual example results show that using decision tree inter-basin water transfer operation rules in the reservoir operating can increase the water resource efficiency and the reservoir comprehensive benefits.This research result has some reference value for the further study and application of the inter-basin water transfer real-time operation.
Keywords:inter-basin water transfer  scheduling rules  data mining  decision tree  GFS forecasting rainfall
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《大连理工大学学报》浏览原始摘要信息
点击此处可从《大连理工大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号