首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Component redundancy allocation in optimal cost preventive maintenance scheduling
Authors:Jorge Miguel Peralta Siopa  José Eugénio Semedo Garção  Júlio Montalvão e Silva
Institution:1.ESTG, Polytechnic Institute of Leiria,Leiria,Portugal;2.CEM – Centro de Engenharia Mecatrónica, Universidade de évora,évora,Portugal;3.LAETA, IDMEC, Instituto Superior Técnico, Universidade de Lisboa,Lisboa,Portugal;4.Universidade de Lisboa,Lisboa,Portugal
Abstract:This work presents a methodology to assist maintenance teams in defining the maintenance schedule and redundancy allocation that minimise the life-cycle average cost of a system. The minimal data required are three average costs and one reliability function. This methodology is useful in a system design phase, since in this situation data is usually scarce or inaccurate, but can also be applied in the exploration phase. It consists of an adaptation of the classical optimal age replacement method, combined with a redundancy allocation problem. A set of simple illustrative examples covering a variety of operating conditions is presented, demonstrating quantitatively the applicability of the methodology to a range of maintenance optimisation decisions.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号