首页 | 本学科首页   官方微博 | 高级检索  
     


Optimizing replacement policy for a cold-standby system with waiting repair times
Authors:Jishen Jia
Affiliation:a Department of Scientific Research, Hennan Mechanical and Electrical Engineering College, Xinxiang 453002, PR China
b School of Applied Sciences, Cranfield University, Bedfordshire MK43 0AL, UK
Abstract:This paper presents the formulas of the expected long-run cost per unit time for a cold-standby system composed of two identical components with perfect switching. When a component fails, a repairman will be called in to bring the component back to a certain working state. The time to repair is composed of two different time periods: waiting time and real repair time. The waiting time starts from the failure of a component to the start of repair, and the real repair time is the time between the start to repair and the completion of the repair. We also assume that the time to repair can either include only real repair time with a probability p, or include both waiting and real repair times with a probability 1 − p. Special cases are discussed when both working times and real repair times are assumed to be geometric processes, and the waiting time is assumed to be a renewal process. The expected long-run cost per unit time is derived and a numerical example is given to demonstrate the usefulness of the derived expression.
Keywords:Geometric process   Cold-standby system   Long-run cost per unit time   Replacement policy   Maintenance policy
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号