首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Routing and scheduling in project shipping
Authors:Kjetil Fagerholt  Lars Magnus Hvattum  Trond A V Johnsen  Jarl Eirik Korsvik
Institution:1. Department of Industrial Economics and Technology, Norwegian University of Science and Technology, Alfred Getz veg 3, 7491, Trondheim, Norway
2. Norwegian Marine Technology Research Institute (MARINTEK), POB 4125 Valentinlyst, 7450, Trondheim, Norway
3. Department of Marine Technology, Norwegian University of Science and Technology, 7491, Trondheim, Norway
Abstract:Tramp shipping companies are committed to transport a set of contracted cargoes and try to derive additional revenue from carrying optional spot cargoes. Here, we present a real life ship routing and scheduling problem for a shipping company operating in project shipping, a special segment of tramp shipping. This segment differs from more traditional tramp segments, as the cargoes are usually transported on a one-time basis. Because of the special nature of the cargoes, complicating requirements regarding stowage onboard the ships and cargo coupling must be considered while determining routes and schedules for the ships in the fleet. A mathematical model is presented and a tabu search heuristic is proposed to solve the problem. Computational results show that the tabu search heuristic provides optimal or near-optimal solutions in a reasonable amount of time, and that it can give significant improvements to manual planning for the shipping company.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号