首页 | 本学科首页   官方微博 | 高级检索  
     


Release time calculations for the SPES direct UCx target
Authors:M. Barbui  A. Andrighetto  C. Antonucci  S. Carturan  F. Cervellera  S. Cevolani  M. Cinausero  P. Colombo  A. Dainelli  P. Di Bernardo  F. Gramegna  G. Maggioni  G. Meneghetti  C. Petrovich  L. Piga  G. Prete  V. Rizzi  M. Santana-Leitner  M. Tonezzer  P. Zanonato  D. Zafiropoulos
Affiliation:(1) INFN Laboratori Nazionali di Legnaro, viale dell'Universitá 2, 35020 Legnaro (Pd), Italy;(2) ENEA, via M.M. Sole 4, 40129 Bologna, Italy;(3) Dipartimento di Ingegneria Meccanica, via Venezia 1, 35131 Padova, Italy;(4) Dipartimento di Scienze Chimiche, via Marzolo 1, 35131 Padova, Italy;(5) CERN, 1211 Geneva, Switzerland
Abstract:A Direct Target for a mid-term RIB ISOL-type facility is being developed at LNL, in the framework of the R&D for the SPES project [1]. Using a 40 MeV proton beam impinging on a UCx thick target of 2.5 g/cm3 density, a production rate of 1013 in target fissions per second is expected [2]. The crucial point, when short-lived isotopes are produced in the target, is to build systems (target + ion source) with good release properties and high efficiency. Monte Carlo simulations were performed using the GEANT4 toolkit [3] and the RIBO code [4] in order to optimize our target geometry and to estimate the average release time.
Keywords:29.25.Rm Sources of radioactive nuclei  24.10.Lx Monte Carlo simulations (including hadron and parton cascades and string breaking models)  25.85.Ge Charged-particle-induced fission
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号