首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Minimizing makespan in re-entrant permutation flow-shops
Authors:JC-H Pan  J-S Chen
Institution:1.National Taiwan University of Science and Technology,Taipei,Taiwan;2.Far East College,Tainan,Taiwan
Abstract:A re-entrant flow-shop (RFS) describes situations in which every job must be processed on machines in the order of M1, M2, …, M m , M1, M2, …,M m , …, and M1, M2, …,M m . In this case, every job can be decomposed into L levels and each level starts on M1, and finishes on M m . In a RFS case, if the job ordering is the same on any machine at each level, then it is said that no passing is allowed since any job is not allowed to pass any previous job. The RFS scheduling problem where no passing is allowed is called the re-entrant permutation flow-shop (RPFS) problem. This paper proposes three extended mixed BIP formulations and six extended effective heuristics for solving RPFS scheduling problems to minimize makespan.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号