首页 | 本学科首页   官方微博 | 高级检索  
     


Coal bank scheduling using a mathematical programming model
Authors:Ruhul A. Sarker

Eldon A. Gunn

Affiliation:

Department of Industrial and Production Engineering, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh

Department of Industrial Engineering, Technical University of Nova Scotia, Halifax, Nova Scotia, Canada

Abstract:Coals are extracted from mines and upgraded on the surface for customers. The upgraded coals must be aged at least four weeks in a bank before being supplied to customers. Different sizes of banks are required for different lengths of time at different points in time. Bigger banks increase the floor space capacity and reduce handling costs. The proper location of banks reduces the total space requirement and bank movement after building. In this paper, we address the bank size and location problem and solve it by using a mathematical programming approach.
Keywords:coal bank   scheduling   integer programming   inventory
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号