Ensuring the potential for an intended quality of a measurement result must be done before and during the measurement, not after it (when it is too late) |
| |
Authors: | Paul De Bièvre |
| |
Institution: | (1) Kasterlee, Belgium |
| |
Abstract: | |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|