首页 | 本学科首页   官方微博 | 高级检索  
     


Tropical optimization problems in time-constrained project scheduling
Authors:N. Krivulin
Affiliation:1. Faculty of Mathematics and Mechanics, St. Petersburg State University, St. Petersburg, Russia.nkk@math.spbu.ru
Abstract:We consider a project that consists of activities to be performed in parallel under various temporal constraints, which include start-start, start-finish and finish-start precedence relationships, release times, deadlines and due dates. Scheduling problems are formulated to find optimal schedules for the project with respect to different objective functions to be minimized, such as the project makespan, the maximum deviation from the due dates, the maximum flow-time and the maximum deviation of finish times. We represent these problems as optimization problems in terms of tropical mathematics, and then solve them by applying direct solution methods of tropical optimization. As a result, new direct solutions of the scheduling problems are obtained in a compact vector form, which is ready for further analysis and practical implementation. The solutions are illustrated by simple numerical examples.
Keywords:Idempotent semifield  optimization problem  project scheduling  precedence relationship  scheduling objective
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号