首页 | 本学科首页   官方微博 | 高级检索  
     


A tour construction heuristic for the travelling salesman problem
Authors:C-P Hwang  B Alidaee  J D Johnson
Affiliation:1.University of Mississippi,USA
Abstract:The tour construction heuristic that generates initial tours for the tour improvement heuristics plays an important role in solving the travelling salesman problem (TSP). With the help of an effective tour construction heuristic, the performance of a heuristic can be improved. In this study we present a new tour construction algorithm, the construction priority (CP). We incorporate the performance of the CP into metaheuristics such as tabu search, genetic algorithm, space smoothing, and noising methods. The performance of the CP is empirically compared with the nearest neighbour (NN) approach. Extensive computational comparison shows that the CP is considerably more effective compared to NN.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号