首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Interior point method for long-term generation scheduling of large-scale hydrothermal systems
Authors:Anibal Tavares Azevedo  Aurelio Ribeiro Leite Oliveira  Secundino Soares
Institution:(1) Mathematic Department, Paulista State University, Av. Ariberto Pereira da Cunha, 333, Guaratinguetá, SP, 12516-410, Brazil;(2) Applied Mathematic Department, State University of Campinas, Rua Sergio Buarque de Holanda, 651, Campinas, SP, 13083-970, Brazil;(3) School of Electrical and Computer Engineering, State University of Campinas, Rua Albert Einstein, 400, Campinas, SP, 13083-852, Brazil
Abstract:This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.
Keywords:Hydrothermal generation scheduling  Long-term operational planning  Nonlinear optimization  Interior point method
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号