首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Job shop scheduling with unit time operations under resource constraints and release dates
Institution:Universidade Federal do Rio de Janeiro, Núcleo de Computação Electrônica and Instituto de Matemática Rio de Janeiro, Brazil
Abstract:We consider the problem of job shop scheduling with m machines and n jobs Ji, each consisting of li unit time operations. There are s distinct resources Rh and a quantity qh available of each one. The execution of the j-th operation of Ji requires the presence of uijh units of Rh, 1 ≤in, 1 ≤jli, and 1 ≤hs. In addition, each Ji has a release date ri, that is Ji cannot start before time ri. We describe algorithms for finding schedules having minimum length or sum of completion times of the jobs. Let l=max{li} and u=|{uijh}|. If m, u and l are fixed, then both algorithms terminate within polynomial time.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号