首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Optimal Expenditure Patterns of a Double-Path Engineering Project
Authors:A Messica  A Mehrez  I David
Institution:(1) Industrial Engineering and Management Department, Ben-Gurion University of the Negev, Beer-Sheva, Israel;(2) Industrial Engineering and Management Department, Ben-Gurion University of the Negev, Beer-Sheva, Israel;(3) Industrial Engineering and Management Department, Ben-Gurion University of the Negev, Beer-Sheva, Israel
Abstract:The optimal expenditure pattern for a double-path engineering project, i.e., a project composed of a nonroutine risky R&D path and a routine nonrisky preparatory path, manufacturing related or marketing related, is studied via the calculus of variations to derive a set of twin second-order nonlinear differential equations whose solution yields the optimal joint expenditure. Assuming independence between the risky and nonrisky paths, a constant return per unit time, a gamma-type unimodal conditional-completion density function for the R&D activity, and the principle of diminishing returns on the effort, we find an interesting interplay between the two paths for the peak position and termination of the expenditures. Counterintuitively, we find that the peak expenditure of the R&D path does not necessarily precede that of the preparatory path, although both path expenditure peaks obey the well-known Kamien–Schwartz theorem. That is, for both paths, the expenditure peak positions precede always the peak of the conditional-completion density function of the R&D path.
Keywords:expenditure patterns  research and development  optimal control  calculus of variations
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号