A probabilistic (max, +) approach for determining railway infrastructure capacity |
| |
Affiliation: | 1. Transport and Mobility Laboratory (TRANSP-OR), School of Architecture, Civil and Environmental Engineering (ENAC), École Polytechnique Fédérale de Lausanne (EPFL), Lausanne, CH-1015, Switzerland;2. Sino-US Global Logistics Institute, Shanghai Jiaotong University, 1954 Huashan Rd., Shanghai, 200030, PR China |
| |
Abstract: | We consider the problem of determining the capacity of a planned railway infrastructure layout under uncertainties. In order to address the long-term nature of the problem, in which the exact (future) demand of service is unknown, we develop a “timetable”-free approach to avoid the specification of a particular timetable. We consider a generic infra-element that allows a concise representation of many different combinations of infrastructure, safety systems and traffic regimes, such as mixed double and single track lines (e.g., a double track line including a single tunnel tube), and train operations on partly overlapping routes at station yards. We translate the capacity assessment problem for such a generic infra-element into an optimization problem and provide a solution procedure. We illustrate our approach with a capacity assessment for the newly built high-speed railway line in The Netherlands. |
| |
Keywords: | |
本文献已被 ScienceDirect 等数据库收录! |
|