首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Preventive maintenance scheduling of power generating units
Authors:Michèle Charest  Jacques A Ferland
Institution:(1) Université de Montréal, H3C 3J7 Montréal, Québec, Canada
Abstract:The problem of preventive maintenance planning of electric power generating units can be formulated as a mixed-integer linear optimization problem. An extension of the model is presented to deal with more realistic assumptions about utilization of power resource. We propose a heuristic iterative exchange procedure to solve these problems. We introduce two methods to prevent jamming situations outside the feasible domain or at a local optimum. The first method is a recursive exchange procedure called multiple exchanges method and the second relies on Lagrangian relaxation. Furthermore, we compare these procedures with a tabu search.This research was supported by NSERC (Grant A8312) and FCAR (Grant ER-0289).Michèle Charest had an NSERC Scholarship to work on this project.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号