工期-费用权衡问题的两个不确定机会约束规划模型
引用本文:张倩,王小胜,惠明晶. 工期-费用权衡问题的两个不确定机会约束规划模型[J]. 模糊系统与数学, 2020, 34(3): 70-78
作者姓名:张倩  王小胜  惠明晶
作者单位:河北工程大学管理工程与商学院,河北邯郸056038;河北工程大学数理科学与工程学院,河北邯郸056038
基金项目:国家自然科学基金;邯郸市科技支撑计划;河北省研究生创新项目
摘    要:项目调度问题是指管理者通过资源分配,延长或缩短某些工序的持续时间,达到项目费用和工期之间的平衡。在实际工程项目中,环境的不确定性往往是项目管理者需要考虑的因素之一。本文应用不确定理论描述不确定环境中的项目调度问题,将每道工序的持续时间分为正常持续时间和可变动持续时间。其中,假设工序的正常持续时间为不确定变量,可变动持续时间为决策变量,分别构建在项目费用和项目工期约束下的两个不确定机会约束规划模型。依据不确定变量运算法则,将所建立的不确定规划模型转化为等价的确定模型。最后,通过一个工程实例验证模型的合理性。

关 键 词:项目调度  工期-费用权衡  不确定理论

Two Uncertain Chance-constrained Programming Models for Time-cost Trade-off Problem
ZHANG Qian,WANG Xiao-sheng,HUI Ming-jing. Two Uncertain Chance-constrained Programming Models for Time-cost Trade-off Problem[J]. Fuzzy Systems and Mathematics, 2020, 34(3): 70-78
Authors:ZHANG Qian  WANG Xiao-sheng  HUI Ming-jing
Affiliation:(School of Management Engineering and Business,Hebei University of Engineering.Handan 056038,China;School of Mathematics&.Physics,Hebei University of Engineering,Handan 056038,China)
Abstract:Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and completion time of a project.The uncertainty of the environment is an important factor in the process of project implementation.In this paper,an uncertain project scheduling problem is described based on uncertainty theory,in which the duration of each activity is divided into normal duration and change duration.Assume that the normal duration be an uncertain variable and take the change duration as decision variable.Two uncertain chance-constrained programming models are proposed under the constraint of project cost and project duration in order to satisfy different management requirements.To solve above the models,the uncertain chance-constrained programming models are transformed into equivalent deterministic programming models based on the operational law of uncertain variables.Finally,a numerical example is illustrated to show the reasonable of models.
Keywords:Project Scheduling  Time-cost Trade-off  Uncertainty Theory