首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Flexible job shop scheduling problem for parallel batch processing machine with compatible job families
Institution:Industrial & Systems Engineering, Liberty University, Lynchburg, VA, USA
Abstract:Flexible Job-Shop Scheduling Problem (FJSP) with Parallel Batch processing Machine (PBM) is studied. First, a Mixed Integer Programming (MIP) formulation is proposed for the first time. In order to address an NP-hard structure of this problem, the formulation is modified to selectively schedule jobs. Although there are many jobs on a given floor, semiconductor manufacturing is most challenged by priority jobs that promise a significant amount of financial compensation in exchange for an expedited delivery. This modification could leave some non-priority jobs unscheduled. However, it vastly expedites the discovery of improving solutions by first branching on integer variables with higher priority jobs. This study then turns job-dependent processing times into job-independent ones by assuming a machine has an equal processing time on different jobs. This assumption is roughly true or acceptable for the sake of the reduced computational time in the industry. These changes significantly reduce computational time compared to the original model when tested on a set of common problem instances from the literature. Computational results show that this proposed model can generate an effective schedule for large problems. Author encourages other researchers to propose an improved MIP model.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号