首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A Two-product,Single-machine,Storage-constrained Production Problem
Authors:A Ibrahim  L C Thomas
Institution:1.Department of Mathematics,University of Al Fateh,Libya;2.Department of Business Studies,University of Edinburgh,
Abstract:This paper considers a two-product, single-machine production scheduling problem where there is an added constraint on the amount of finished stock that can be held. The need for a ratio of the cycle times of the two products is a feature both of two-product production scheduling problems contained on one machine and two-product inventory problems with constraints on storage capacity. This means an easy solution algorithm is possible for the problem addressed in the paper which has both types of constraints.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号