首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Estimating a Project's Completion Time Distribution Using Intelligent Simulation Methods
Authors:Thomas M Cook  Robert H Jennings
Institution:1.The University of Tulsa,;2.The University of Texas at Austin,
Abstract:Other researchers have indicated the theoretical problems of using the PERT techniques commonly described in elementary operational research and operations management texts. Monte Carlo simulation has often been suggested as an alternative means of analyzing PERT networks but simulating a network of real world proportions is often assumed to be prohibitively expensive. This paper measures the accuracy and cost of standard PERT and simulation methods for real world sized problems. In addition, several computational heuristics are described and tested that indicate that simulation is a viable alternative. The results indicate that intelligent simulation of PERT networks is considerably more accurate than standard PERT analysis and is definitely not cost prohibitive.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号