首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling tests in automotive R&D projects
Authors:J.-H. Bartels  J. Zimmermann
Affiliation:Clausthal University of Technology, Institute of Management and Economics, Julius-Albert-Strasse 2, D-38678 Clausthal-Zellerfeld, Germany
Abstract:In automotive R&D projects a major part of development cost is caused by tests which utilize expensive experimental vehicles. In this paper, we introduce an approach for scheduling the individual tests such that the number of required experimental vehicles is minimized. The proposed approach is based on a new type of multi-mode resource-constrained project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources. We propose a MILP formulation, which is solvable for small problem instances, as well as several variants of a priority-rule based method that serve to solve large problem instances. The developed solution methods are examined in a comprehensive computational study. For a real-world problem instance it is shown that the introduced approach may enhance the current methods applied in practice.
Keywords:Project scheduling   Renewable and cumulative resources   Multiple execution modes   Experimental vehicles
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号