首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals
Authors:Albert Corominas  Rafael Pastor
Institution:IOC – Institute of Industrial and Control Engineering, Technical University of Catalonia (UPC), Av. Diagonal, 647, 11th floor, 08028 Barcelona, Spain
Abstract:We introduce and formalise a scheduling problem that consists in determining an optimum policy (i.e. one that minimises total inventory holding costs) to produce n part-types using a system that is able to share its capacity at all times among these part-types and that switches between an active and an inactive state for pre-known periods of time. Consequently, when active the system must produce enough reserves to meet the demand during the inactive interval. We show that there is always a simple optimum policy in which the production of the part-types is prioritised and, provided the units are properly defined, the optimum priority ordering corresponds to a non-decreasing sequence of the unit holding costs of the part-types.
Keywords:Scheduling  Multiple part-types production  Failure-prone systems  Cumulative resources
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号