首页 | 本学科首页   官方微博 | 高级检索  
     


Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand
Authors:M-C Wu  L-C Huang  H-M Hsu  T-S Su
Affiliation:1.National Chiao Tung University,Hsin-Chu,Taiwan
Abstract:In a production system with random yield, it may be more cost effective to release lots multiple times towards fulfilling a customer order. Such a decision, called the multiple lot-sizing problem, has been investigated in various contexts. This paper proposes an efficient algorithm for solving a new multiple lot-sizing problem defined in the context of a two-stage production system with non-rigid demand when its process yields are governed by interrupted geometric distributions. We formulate this problem as a dynamic program (DP) and develop lemmas to solve it. However, solving such a DP may be computationally extensive, particularly for large-scale cases with a high yield. Therefore, this study proposes an efficient algorithm for resolving computational issues. This algorithm is designed to reduce the DP network into a much simpler algorithm by combining a group of DP branches into a single one. Extensive experiments were carried out. Results indicate that the proposed reduction algorithm is quite helpful for practitioners dealing with large-scale cases characterized by high-yield.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号