首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Four-Day Workweek Scheduling with Two or Three Consecutive Days Off
Authors:Hesham K Alfares
Institution:(1) System Engineering Department, King Fahd University of Petroleum & Minerals, PO Box 5067, Dhahran, 31261, Saudi Arabia
Abstract:A four-day workweek days-off scheduling problem is considered. Out of the three days off per week for each employee, either two or three days must be consecutive. An optimization algorithm is presented which starts by utilizing the problem's special structure to determine the minimum workforce size. Subsequently, workers are assigned to different days-off work patterns in order to minimize either the total number or the total cost of the workforce. Different procedures must be followed in assigning days-off patterns, depending on the characteristics of labor demands. In some cases, optimum days-off assignments are determined without requiring mathematical programming. In other cases, a workforce size constraint is added to the integer programming model, greatly improving computational performance.
Keywords:workforce scheduling  optimization  integer programming  staffing
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号