首页 | 本学科首页   官方微博 | 高级检索  
     检索      


HIRFL-CSR complex
Authors:XIA Jia-Wen  ZHAN Wen-Long  WEI Bao-Wen  YUAN You-Jin  YUAN Ping  QIAO Wei-Min  GAO Da-Qing  YANG Xiao-Tian  MAN Kai-Di  XIAO Guo-Qing  ZHAO Hong-Wei  YANG Xiao-Dong  CAI Xiao-Hong  SONG Ming-Tao  XU Hu-Shan  MA Li-Zhen  LIU Yong  HE Yuan  ZHOU Zhong-Zu  ZHANG Wei  XU Zhe  MAO Rui-Shi  ZHANG Jun-Hui  JING Lan  YANG Ya-Qing  YANG Jian-Cheng  MAO Li-Jun  CHEN You-Xin
Abstract:The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, At, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm.
Keywords:CSR  commissioning  heavy ion  e-cooling  accumulation
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号