首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Application of time series analysis and modern control theory to the cement plant
Authors:S Hagimura  T Saitoh  Y Yagihara
Institution:(1) Chichibu Cement Co., Ltd., 794-6, 368 Chichibu-city, Saitama, Japan;(2) Chichibu Cement Co., Ltd., 360 Kumagaya-city, Saitama, Japan;(3) System Sougoh Kaihatsu Co., Ltd., 1-28-23, Hongou, Bunkyo-ku, 113 Tokyo, Japan
Abstract:Cement plant process is full of internal noise sources and feedback loops. Therefore, statistical approach is required to understand its dynamic characteristics. Time series analysis has been applied to some important subprocesses of a cement plant process. These are the vertical mill process, calcining process and clinker cooling process. Based on the AR models of these, a set of optimum controllers have been designed by modern control theory. Successful results of application are reported in this paper. A method of determining optimal production level is also discussed.
Keywords:Time series analysis  identification  control  cement plant process
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号