首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A mathematical model and algorithms for the aircraft hangar maintenance scheduling problem
Institution:1. School of Electrical and Information Engineering, Jinan University (Zhuhai Campus), Zhuhai 519070, China;2. Department of Industrial and Systems Engineering, The Hong Kong Polytechnic University, Hung Hum, Hong Kong;3. School of Business Administration, Dongbei University of Finance and Economics, China
Abstract:An aircraft hangar maintenance scheduling problem is studied, motivated by the aircraft heavy maintenance conducted in a hangar operated by an independent maintenance service company. The aircraft hangar maintenance scheduling problem in such context consists of determining a maintenance schedule with minimum penalty costs in fulfilling maintenance requests, and a series of hangar parking plans aligned with the maintenance schedule through the planning period. A mixed-integer linear programming (MILP) mathematical model, integrating the interrelations between the maintenance schedule and aircraft parking layout plans, is presented at first. In the model, the variation of parking capacity of the maintenance hangar and the blocking of the aircraft rolling in and out path are considered. Secondly, the model is enhanced by narrowing down the domain of the time-related decision variables to the possible rolling in and out operations time of each maintenance request. Thirdly, to obtain good quality feasible solutions for large scale instances, a rolling horizon approach incorporating the enhanced mathematical model is presented. The results of computational experiments are reported, showing: (i) the effectiveness of the event-based discrete time MILP model and (ii) the scalability of the rolling horizon approach that is able to provide good feasible solutions for large size instances covering a long planning period.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号