Adaptive policies for multi-mode project scheduling under uncertainty
Authors:Pedro Godinho  Fernando G Branco
Institution:a GEMF, Faculty of Economics, University of Coimbra, Av. Dias da Silva, 165, 3004-512 Coimbra, Portugal
b Department of Civil Engineering, University of Coimbra, Rua Luís Reis Santos, 3030-788 Coimbra, Portugal
Abstract:In this paper we propose an adaptive model for multi-mode project scheduling under uncertainty. We assume that there is a due date for concluding the project and a tardiness penalty for failing to meet this due date, and that several distinct modes may be used to undertake each activity. We define scheduling policies based on a set of thresholds. The starting time of the activity is compared with those thresholds in order to define the execution mode.We propose a procedure, based on the electromagnetism heuristic, for choosing a scheduling policy. In computational tests, we conclude that the adaptive scheduling policy found by using the model and the heuristic solution procedure is consistently better than the optimal non-adaptive policy. When the different modes have very different characteristics and there is a reasonable difference between the average duration of the project and the due date, the cost advantage of the adaptive policy becomes very significant.
Keywords:Project scheduling  Project management  Metaheuristics  Simulation
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号