首页 | 本学科首页   官方微博 | 高级检索  
     


Optimal scheduling of parallel machines with constrained resources
Authors:Konstantin Kogan  
Affiliation:Department of Interdisciplinary Studies––Logistics, Bar Ilan University, Ramat-Gan 52900, Israel
Abstract:This paper analyzes a manufacturing system consisting of parallel machines, which produce one product-type with controllable production rates subject to continuously-divisible, time-dependent resources. The objective is to produce the required amount of product-type units by a due date while minimizing inventory, backlog and production related costs over a production horizon. With the aid of the maximum principle, a number of analytical rules of the optimal scheduling is derived whereby the continuous-time scheduling is reduced to discrete sequencing and timing. As a result, a polynomial-time algorithm is developed for solving the problem.
Keywords:Scheduling   Systems dynamics   Constrained resources
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号