首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach
Authors:Amir Azaron  Reza Tavakkoli-Moghaddam
Institution:aDepartment of Computer Science, Cork Constraint Computation Centre, University College Cork, Cork, Ireland;bDepartment of Industrial Engineering, Faculty of Engineering, University of Tehran, Tehran, Iran
Abstract:We develop a multi-objective model for the time–cost trade-off problem in a dynamic PERT network using an interactive approach. The activity durations are exponentially distributed random variables and the new projects are generated according to a renewal process and share the same facilities. Thus, these projects cannot be analyzed independently. This dynamic PERT network is represented as a network of queues, where the service times represent the durations of the corresponding activities and the arrival stream to each node follows a renewal process. At the first stage, we transform the dynamic PERT network into a proper stochastic network and then compute the project completion time distribution by constructing a continuous-time Markov chain. At the second stage, the time–cost trade-off problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. Then, the STEM method is used to solve a discrete-time approximation of the original problem. Finally, the proposed methodology is extended to the generalized Erlang activity durations.
Keywords:Multiple objective programming  Queueing  Project management and scheduling  Markov processes  Optimal control
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号