首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Financial planning for the preventive maintenance of power distribution systems via fuzzy AHP
Authors:Masood Khodaei Tehrani  Alireza Fereidunian  Hamid Lesani
Institution:1. School of Electrical & Computer Engineering, University of Tehran, Tehran, Iran;2. Department of Electrical & Computer Engineering, K. N. Toosi University of Technology, Tehran, Iran
Abstract:One of the most important objectives of electricity distribution companies is to improve the reliability of the distribution networks. To this end, the electricity distribution companies try to optimally use the existing financial resources in the planning of preventive maintenance (PM) programs to reduce the imposed costs on the system due to the failure of network components and to improve the network reliability. In fuzzy analytical hierarchical process (fuzzy AHP) method, the degree of network reliability and the effectiveness of PM budget in the improvement of network reliability are selected as decision criteria in the budget allocation procedure. The areas served by the power distribution network are prioritized relative to each other and are assigned weights based on these priorities. The PM budget is determined based on the obtained weights. The medium voltage distribution network of seven areas in the city of Tehran have been selected for the implementation of the proposed method and the analysis of the obtained results. © 2014 Wiley Periodicals, Inc. Complexity 21: 36–46, 2016
Keywords:Reliability‐centered maintenance  Preventive maintenance  Fuzzy analytical hierarchical process  Electricity distribution network
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号