VEPP-2000 collider commissioning |
| |
Authors: | Yu M Shatunov |
| |
Institution: | (1) VEPP-2000 team, Budker Institute of Nuclear Physics, Novosibirsk, Russia |
| |
Abstract: | Construction of the VEPP-2000 construction was completed at the end of 2006. The first beam was captured in a special regime
without final focus solenoids. In this regime, all systems of power supplies and machine control were calibrated and tuned.
In the same mode vacuum chamber treatment by synchrotron radiation was performed with an electron beam current of up to 150
mA. The first test of the round beam option was performed at an energy of 508 MeV with a solenoidal field of 10 T in two straight
sections of interaction.
The text was submitted by the author in English. |
| |