首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A model of clinker capacity expansion
Institution:1. Department of Chemical and Biomolecular Engineering, University of Delaware, 150 Academy Street, Newark, Delaware, 19716, USA;1. Department of Electrical Engineering, West Tehran Branch, Islamic Azad University, Tehran, Iran;2. Department of Electrical Engineering, Sharif University of Technology, Tehran, Iran;3. Institute for Systems and Computer Engineering, Technology and Science (INESC TEC), Porto, Portugal;4. Faculty of Engineering of the University of Porto, (FEUP), Porto, Portugal
Abstract:This paper describes a model which has been applied in practice to determine an optimal plan for clinker capacity expansion. The problem was formulated as an integer linear program aiming to determine the optimal number, size and location of kilns to be introduced each year during a given planning horizon. The optimal solution is defined as the one which maximises the net present value (NPV) of the cash flow generated by the introduction and operation of new kilns subject to capacity and demand constraints. Various demand scenarios and capital expenditure structures were tested by means of the model and a number of possible locations for new kilns were evaluated. Finally, the benefits derived by the company where the application took place are listed.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号