首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A generalized linear programming model for nurse scheduling
Institution:1. Département de mathématiques et de génie industriel, GERAD and École Polytechnique de Montréal, C P. 6079, succursale Centre-ville, Montréal, Qué., Canada H3C 3A7;2. Département d''Administration de la Santé, Université de Montréal, CP. 6128, succursale Centre-ville Montréal, Qué., Canada H3C 3J7;1. Automatic Control Lab, School of Electrical Engineering, KTH Royal Institute of Technology, Stockholm, Sweden;2. Automatic Control Lab, EPFL-STI-IGM-LA, Station 9, CH-1015 Lausanne, Switzerland;1. Barkatullah University Bhopal, MP, 462023, India;2. Technocrats Institute of Technology (TIT Group), Bhopal, MP, 462023, India;3. Department of Mathematics, Govt N.M.V. Hoshangabad, M.P, India;1. Department of Mathematics, Vaishnavi College of Technology, 462047, India;2. Department of Mathematics, Govt. NMV Hoshangabad,.461001,.India;3. Department of Mathematics, AMITY University Kolkata, 700157,.India;1. Department of Industrial Engineering, Bahçeşehir University, 34353 Beşiktaş, İstanbul, Turkey;2. Department of Industrial Engineering, Boğaziçi University, 34342 Bebek, İstanbul, Turkey;1. Department of Industrial Engineering, The Graduate School of Natural and Applied Sciences, Dokuz Eylul University, Tinaztepe Campus, Buca, 35397 Izmir, Turkey;2. Department of Industrial Engineering, Dokuz Eylul University, Tinaztepe Campus, Buca, 35397 Izmir, Turkey
Abstract:This paper presents a 0–1 column generation model with a resource constrained shortest path auxiliary problem for nurse scheduling. The master problem finds a configuration of individual schedules to satisfy the demand coverage constraints while minimizing salary costs and maximizing both employee preferences and team balance. A feasible solution of the auxiliary problem is an acceptable schedule for a given nurse, with respect to collective agreement requirements such as seniority, workload, rotations and days off. We define a new resource structure in the auxiliary problem in order to take into account the complex collective agreement rules specific to the nurse scheduling problem. This model generalizes further the previous formulations discussed in the literature and can be viewed as a general scheme for complex personnel scheduling problems, especially in the context of organizations which operate around the clock. Solution methods and preliminary test results are discussed.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号