首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   74篇
  免费   0篇
数学   73篇
物理学   1篇
  2022年   1篇
  2020年   2篇
  2019年   1篇
  2018年   1篇
  2015年   2篇
  2014年   7篇
  2013年   7篇
  2012年   1篇
  2011年   6篇
  2010年   12篇
  2009年   7篇
  2008年   7篇
  2007年   9篇
  2006年   2篇
  2005年   1篇
  2004年   2篇
  2003年   1篇
  2001年   2篇
  2000年   1篇
  1998年   1篇
  1996年   1篇
排序方式: 共有74条查询结果,搜索用时 15 毫秒
1.
We consider a randomized on-line scheduling problem where each job has to be scheduled on any of m identical processors. The objective is to minimize the expected makespan. We show that the competitive ratio of any randomized algorithm for m=3 processors must be strictly greater than .  相似文献   
2.
The job-shop scheduling problem (JSP) is one of the hardest problems (NP-complete problem). In a lot of cases, the combination of goals and resource exponentially increases search space. The objective of resolution of such a problem is generally, to maximize the production with a lower cost and makespan. In this paper, we explain how to modify the objective function of genetic algorithms to treat the multi-objective problem and to generate a set of diversified “optimal” solutions in order to help decision maker. We are interested in one of the problems occurring in the production workshops where the list of demands is split into firm (certain) jobs and predicted jobs. One wishes to maximize the produced quantity, while minimizing as well as possible the makespan and the production costs. Genetic algorithms are used to find the scheduling solution of the firm jobs because they are well adapted to the treatment of the multi-objective optimization problems. The predicted jobs will be inserted in the real solutions (given by genetic algorithms). The solutions proposed by our approach are compared to the lower bound of the cost and makespan in order to prove the quality and robustness of our proposed approach.  相似文献   
3.
When the processing times of jobs are controllable, selected processing times affect both the manufacturing cost and the scheduling performance. A well known example for such a case that this paper specifically deals with is the turning operation on a CNC machine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. In this paper, we deal with making optimal machine-job assignments and processing time decisions so as to minimize total manufacturing cost while the makespan being upper bounded by a known value, denoted as ?-constraint approach for a bicriteria problem. We then give optimality properties for the resulting single criterion problem. We provide alternative methods to compute cost lower bounds for partial schedules, which are used in developing an exact (branch and bound) algorithm. For the cases where the exact algorithm is not efficient in terms of computation time, we present a recovering beam search algorithm equipped with an improvement search procedure. In order to find improving search directions, the improvement search algorithm uses the proposed cost bounding properties. Computational results show that our lower bounding methods in branch and bound algorithm achieve a significant reduction in the search tree size that we need to traverse. Also, our recovering beam search and improvement search heuristics achieve solutions within 1% of the optimum on the average while they spent much less computational effort than the exact algorithm.  相似文献   
4.
In this paper, we consider the rescheduling problem for jobs on a single machine with release dates to minimize makespan under a limit on the maximum sequence disruption. We show that the considered problem can be solved in polynomial time.  相似文献   
5.
We consider the problem of scheduling a set of independent tasks on multiple same-speed processors with planned shutdown times with the aim of minimizing the makespan. We give an LPT-based algorithm, LPTX, which yields a maximum completion time that is less than or equal to 3/2 the optimal maximum completion time or 3/2 the time that passes from the start of the schedule until the latest end of a downtime. For problems where the optimal schedule ends after the last downtime, and when the downtimes represent fixed jobs, the LPTX maximum completion time is within 3/2 of the optimal maximum completion time. In addition, we show that this result is asymptotically tight for the class of polynomial algorithms assuming that PNP. We also show that the bound obtained previously for a similar problem, when no more than half of the machines are shut down at the same time, for the LPT algorithm is asymptotically tight in the class of polynomial algorithms if PNP.  相似文献   
6.
Two-machine flowshop scheduling to minimize makespan is one of the most well-known classical scheduling problems. Johnson’s rule for solving this problem has been widely cited in the literature. We introduce in this paper the concept of composite job, which is an artificially constructed job with processing times such that it will incur the same amount of idle time on the second machine as that incurred by a chain of jobs in a given processing sequence. This concept due to Kurisu first appeared in 1976 to deal with the two-machine flowshop scheduling problem involving precedence constraints among the jobs. We show that this concept can be applied to reduce the computational time to solve some related scheduling problems. We also establish a link between solving the two-machine flowshop makespan minimization problem using Johnson’s rule and the relocation problem introduced by Kaplan. We present an intuitive interpretation of Johnson’s rule in the context of the relocation problem.  相似文献   
7.
Traditionally, the permutation flowshop scheduling problem (PFSP) was with the criterion of minimizing makespan. The permutation flowshop scheduling problem to minimize the total flowtime has attracted more attention from researchers in recent years. In this paper, a hybrid genetic local search algorithm is proposed to solve this problem with each of both criteria. The proposed algorithm hybridizes the genetic algorithm and a novel local search scheme that combines two local search methods: the Insertion Search (IS) and the Insertion Search with Cut-and-Repair (ISCR). It employs the genetic algorithm to do the global search and two local search methods to do the local search. Two local search methods play different roles in the search process. The Insertion Search is responsible for searching a small neighborhood while the Insertion Search with Cut-and-Repair is responsible for searching a large neighborhood. Furthermore, the orthogonal-array-based crossover operator is designed to enhance the GA’s capability of intensification. The experimental results show the advantage of combining the two local search methods. The performance of the proposed hybrid genetic algorithm is very competitive. For the PFSP with the total flowtime criterion, it improved 66 out of the 90 current best solutions reported in the literature in short-term search and it also improved all the 20 current best solutions reported in the literature in long-term search. For the PFSP with the makespan criterion, the proposed algorithm also outperforms the other three methods recently reported in the literature.  相似文献   
8.
Minimizing makespan on a single burn-in oven in semiconductor manufacturing   总被引:1,自引:0,他引:1  
This paper considers a scheduling problem for a single burn-in oven in semiconductor manufacturing industry where the oven is a batch processing machine and each batch processing time is represented by the largest processing time among those of all the jobs contained in the batch. The objective measure of the problem is the maximum completion time (makespan) of all jobs. This paper investigates a static case in which all jobs are available to process at time zero, and also analyzes a dynamic case with different job-release times, for which a branch-and-bound algorithm and several heuristics are exploited. The worst case error performance ratios of the heuristics are also derived.  相似文献   
9.
Saadani et al. [N.E.H. Saadani, P. Baptiste, M. Moalla, The simple F2∥Cmax with forbidden tasks in first or last position: A problem more complex that it seems, European Journal of Operational Research 161 (2005) 21–31] studied the classical n-job flow shop scheduling problem F2∥Cmax with an additional constraint that some jobs cannot be placed in the first or last position. There exists an optimal job sequence for this problem, in which at most one job in the first or last position is deferred from its position in Johnson’s [S.M. Johnson, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly 1 (1954) 61–68] permutation. The problem was solved in O(n2) time by enumerating all candidate job sequences. We suggest a simple O(n) algorithm for this problem provided that Johnson’s permutation is given. Since Johnson’s permutation can be obtained in O(n log n) time, the problem in Saadani et al. (2005) can be solved in O(n log n) time as well.  相似文献   
10.
A mathematical programming model is proposed for the two parallel machines scheduling problem where one machine is periodically unavailable, jobs are non-preemptive, and the objective is minimizing the makespan. The model is established by transforming the two parallel machine setting into a single machine setting. Average-case analyses of the classical Longest Processing Time first (LPT) algorithm and the List Scheduling (LS) are presented. Computational experiments show that the LPT algorithm beats the LS algorithm in all the 96 combinations of two main parameters from an average-case error point of view and that the average-case error of the LPT algorithm is less than 2% when the number of jobs is greater than twenty. Unexpectedly, there also exist instances showing that the LS algorithm may beat the LPT algorithm from the average-case error point of view.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号