排序方式: 共有12条查询结果,搜索用时 15 毫秒
1.
2.
兰州重离子加速器冷却储存环HIRFL-CSR,是一个多用途、多功能的双冷却储存环同步加速器系统,由主环CSRm和实验环CSRe构成,并以兰州重离子级联回旋加速器HIRFL作注入器。CSR利用高频变谐波的方法,将重离子束的能量从7~25 MeV/u同步加速到200~1 000 MeV/u,同时利用重离子储存环中空心电子束冷却技术将束流品质提高1个数量级,并通过储存环的快引出及慢引出,提供多种类的重离子束以及放射性次级束(RIBs),以开展范围更广精度更高的物理实验。该装置于2007年投入运行,已取得了重要的运行结果,如实现了剥离注入与多圈注入、空心电子束对重离子束的冷却与累积、变谐波宽能区同步加速、等时性环型谱仪、RIBs的产生收集与ToF高分辨质量测量以及高能重离子束的变能慢引出等。 相似文献
3.
夏佳文 原有进 刘勇 杨建成 徐瑚珊 肖国青 杨晓东 张玮 高大庆 周忠祖 毛瑞士 冒立军 何源 许哲 杨雅清 肖陈 殷达钰 赵铁成 武军霞 李国宏 李杰 李朋 李珂 胡正国 HIRFL-CSR commissioning group 《中国物理C(英文版)》2009,33(Z2):12-17
HIRFL-CSR, a new heavy ion cooler-storage-ring system at IMP, had been in commissioning since the beginning of 2006. In the two years of 2006 and 2007 the CSR commissioning was finished, including the stripping injection (STI), electron-cooling with hollow electron beam, C-beam stacking with the combination of STI and e-cooling, the wide energy-range synchrotron ramping from 7 MeV/u to 1000 MeV/u by changing the RF harmonic-number at mid-energy, the multiple multi-turn injection (MMI), the beam accumulation with MMI and e-cooling for heavy-ion beams of Ar, Kr and Xe, the fast extraction from CSRm and single-turn injection to CSRe, beam stacking in CSRe and the RIBs mass-spectrometer test with the isochronous mode in CSRe by using the time-of-flight method. 相似文献
4.
Commissioning of electron cooling in CSRe 总被引:1,自引:0,他引:1
杨晓东 冒立军 李国宏 李杰 马晓明 晏太来 原有进 宋明涛 杨建成 刘勇 赵铁成 夏佳文 张玮 高大庆 周忠祖 燕宏斌 毛瑞士 何源 韩少斐 郑建华 杨晓天 赵红卫 肖国青 殷达钰 李朋 贾欢 Parkhomchuk Vasily Reva Vladimir Skorobogatov Dmitry 《中国物理 C》2010,34(7):998-1004
The 400 MeV/u 12C6+ ion beam was successfully cooled by the intensive electron beam near 1 A in CSRe.The momentum cooling time was estimated near 15 s.The cooling force was measured in the cases of difierent electron beam profiles,and the difierent angles between the ion beam and electron beam.The lifetime of the ion beam in CSRe was over 80 h.The dispersion in the cooling section was confirmed as positive close to zero.The beam sizes before cooling and after cooling were measured by the moving screen.The beam diameter after cooling was about 1 mm.The bunch length was measured with the help of the signals from the beam position monitor.The difiusion was studied in the absence of the electron beam. 相似文献
5.
主环二极铁电源是兰州重离子加速器冷却储存环(HIRFL-CSR)工程的关键设备和指标要求最高的一台电源,采用了独特的拓扑和控制策略。为满足峰值功率3.15 MW(3 kA,1.45 kV)的输出能力和快脉冲要求,采用了晶闸管整流并联脉宽调制补偿单元的主电路拓扑结构和特殊的控制方式,这套综合方案确保电源满足了全部技术指标。本文介绍了该拓扑结构的原理和优势,讨论了为满足±2×10-4的跟踪误差的要求而采用的控制拓扑和双基准给定的原理,并简介了调试过程和近年来的运行和改进情况。 相似文献
6.
HIRFL-CSR complex 总被引:2,自引:0,他引:2
夏佳文 詹文龙 魏宝文 原有进 袁平 乔为民 高大庆 杨晓天 满开第 肖国青 赵红卫 杨晓东 蔡晓红 宋明涛 徐瑚珊 马力祯 刘勇 何源 周忠祖 张玮 许哲 毛瑞士 张军辉 敬岚 杨雅清 杨建成 冒立军 陈又新 《中国物理 C》2009,33(9):804-810
The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm. 相似文献
7.
夏佳文 原有进 刘勇 杨建成 徐瑚珊 肖国青 杨晓东 张玮 高大庆 周忠祖 毛瑞士 冒立军 何源 许哲 杨雅清 肖陈 殷达钰 赵铁成 武军霞 李国宏 李杰 李朋 李珂 胡正国 HIRFL-CSR commissioning group 《中国物理 C》2009,33(Z2):12-17
HIRFL-CSR, a new heavy ion cooler-storage-ring system at IMP, had been in commissioning since the beginning of 2006. In the two years of 2006 and 2007 the CSR commissioning was finished, including the stripping injection (STI), electron-cooling with hollow electron beam, C-beam stacking with the combination of STI and e-cooling, the wide energy-range synchrotron ramping from 7 MeV/u to 1000 MeV/u by changing the RF harmonic-number at mid-energy, the multiple multi-turn injection (MMI), the beam accumulation with MMI and e-cooling for heavy-ion beams of Ar, Kr and Xe, the fast extraction from CSRm and single-turn injection to CSRe, beam stacking in CSRe and the RIBs mass-spectrometer test with the isochronous mode in CSRe by using the time-of-flight method. 相似文献
8.
杨晓东 李杰 冒立军 李国宏 詹文龙 夏佳文 赵红卫 肖国青 原有进 宋明涛 刘勇 杨建成 高大庆 周忠祖 何源 张玮 郑建华 毛瑞士 赵铁成 Parkhomchuk Vasily 《中国物理C(英文版)》2009,33(Z2):18-21
A new generation electron cooler has started operation in the heavy ion synchrotron CSRm which is used to increase the intensity of heavy ions. Transverse cooling of the ion beam after horizontal multi-turn injection allows beam accumulation at the injection energy. After optimization of the accumulation process an intensity increase in a synchrotron pulse by more than one order of magnitude has been achieved. In given accumulation time interval of 10 seconds, 108 particles have been accumulated and accelerated to the final energy. The momentum spread after accumulation and acceleration in the 10-4 range has been demonstrated in six species of ion beams. Primary measurements of accumulation process varying with electron energy, electron beam current, electron beam profile, expansion factor and injection interval have been performed. The lifetimes of ion beams in the presence of electron beams were roughly measured with the help of DCCT signal. 相似文献
9.
主环二极铁电源是兰州重离子加速器冷却储存环(HIRFL-CSR)工程的关键设备和指标要求最高的一台电源,采用了独特的拓扑和控制策略。为满足峰值功率3.15MW(3kA,1.45kV)的输出能力和快脉冲要求,采用了晶闸管整流并联脉宽调制补偿单元的主电路拓扑结构和特殊的控制方式,这套综合方案确保电源满足了全部技术指标。本文介绍了该拓扑结构的原理和优势,讨论了为满足±2×10-4的跟踪误差的要求而采用的控制拓扑和双基准给定的原理,并简介了调试过程和近年来的运行和改进情况。 相似文献
10.
Commissioning of electron cooling in CSRm 总被引:1,自引:0,他引:1
杨晓东 李杰 冒立军 李国宏 詹文龙 夏佳文 赵红卫 肖国青 原有进 宋明涛 刘勇 杨建成 高大庆 周忠祖 何源 张玮 郑建华 毛瑞士 赵铁成 Parkhomchuk Vasily 《中国物理 C》2009,33(Z2):18-21
A new generation electron cooler has started operation in the heavy ion synchrotron CSRm which is used to increase the intensity of heavy ions. Transverse cooling of the ion beam after horizontal multi-turn injection allows beam accumulation at the injection energy. After optimization of the accumulation process an intensity increase in a synchrotron pulse by more than one order of magnitude has been achieved. In given accumulation time interval of 10 seconds, 108 particles have been accumulated and accelerated to the final energy. The momentum spread after accumulation and acceleration in the 10-4 range has been demonstrated in six species of ion beams. Primary measurements of accumulation process varying with electron energy, electron beam current, electron beam profile, expansion factor and injection interval have been performed. The lifetimes of ion beams in the presence of electron beams were roughly measured with the help of DCCT signal. 相似文献