排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
Journal of Heuristics - In this article, we study an Inventory Routing Problem with deterministic customer demand in a two-tier supply chain. The supply chain network consists of a supplier using a... 相似文献
2.
This paper concerns the domain of flexible manufacturing systems (FMS) and focuses on the scheduling problems encountered in these systems. We have chosen the cyclic behaviour to study this problem, to reduce its complexity. This cyclic scheduling problem, whose complexity is NP-hard in the general case, aims to minimise the work in process (WIP) to satisfy economic constraints. We first recall and discuss the best known cyclic scheduling heuristics. Then, we present a two-step resolution approach. In the first step, a performance analysis is carried out; it is based on the Petri net modelling of the production process. This analysis resolves some indeterminism due to the system’s flexibility and allows a lower bound of the WIP to be obtained. In the second step, after a formal model of the scheduling problem has been given, we describe a genetic algorithm approach to find a schedule which can reach the optimal production speed while minimizing the WIP. Finally, our genetic approach is validated and compared with known heuristics on a set of test problems. 相似文献
1