首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
数学   1篇
  2002年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
This paper is concerned with the development and applicationof stationary models for scheduling single and multiple preventivemaintenance (PM) situations focusing on issues of model implementation.The first part of the paper deals with the practical implementationof the basic single PM scheduling model based on the renewalprocess. The main practical difficulty is lifetime-distributionselection for small data sets which is typical in PM situations.Thus a sensitivity analysis of optimal PM interval to selectedlife distributions following PM and failures (corrective maintenance)is carried out. It has been found that the selected pair ofdistributions using AIC criteria as well as the Weibull–Weibullfitted pair have the smallest availability loss in estimatingthe optimal PM interval. The second part of this paper is concernedwith modelling multi-PM situations—something which hasreceived very little attention in the literature despite itsfrequent implementation in real life. A multi-PM model basedon the renewal process is discussed. The model assumes a multi-PMinterval which is an integer multiple of the single PM intervalsand different renewal functions following each type of PM. Theprocedure of model implementation is discussed through numericalexample.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号