首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
数学   1篇
  2012年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
The Optimization utilization of raw material and components is one of the main challenges in production and project management success. Executives usually face with waste and shortage of raw material which cause delay and cost, however the material and required components are usually provided more than needed. Therefore planning to provide these components from existing spools of material is one of these challenges especially when the number of the needed material pieces and the existing spools are high. For instance, in power plant projects cables are usually provided in form of spools which later cut down to required pieces in the project location. Extraction of each needed piece of cable from specific existing spool is a decision to be made. In this paper, a heuristic method based on integrating Integer Goal Programming and Taguchi Method is suggested to optimize cutting down process of these materials.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号