首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   74篇
  免费   0篇
数学   73篇
物理学   1篇
  2022年   1篇
  2020年   2篇
  2019年   1篇
  2018年   1篇
  2015年   2篇
  2014年   7篇
  2013年   7篇
  2012年   1篇
  2011年   6篇
  2010年   12篇
  2009年   7篇
  2008年   7篇
  2007年   9篇
  2006年   2篇
  2005年   1篇
  2004年   2篇
  2003年   1篇
  2001年   2篇
  2000年   1篇
  1998年   1篇
  1996年   1篇
排序方式: 共有74条查询结果,搜索用时 0 毫秒
71.
We consider a bi-criteria parallel machine scheduling problem in which the first objective is the minimization of the makespan of the schedule and the second objective is the minimization of the maximum machine cost. Since the problem is strongly NP-hard, we propose a fast heuristic and derive its worst-case performance bound.  相似文献   
72.
We study coordination mechanisms for scheduling n jobs on m parallel machines where agents representing the jobs interact to generate a schedule. Each agent acts selfishly to minimize the completion time of his/her own job, without considering the overall system performance that is measured by a central objective. The performance deterioration due to the lack of a central coordination, the so-called price of anarchy, is determined by the maximum ratio of the central objective function value of an equilibrium schedule divided by the optimal value. In the first part of the paper, we consider a mixed local policy with some machines using the SPT rule and other machines using the LPT rule. We obtain the exact price of anarchy for the problem of minimizing the makespan and some bounds for the problem of minimizing the total completion time. In the second part of the paper, we consider parallel machine scheduling subject to eligibility constraints. We devise new local policies based on the flexibilities and the processing times of the jobs. We show that the newly devised local policies outperform both the SPT and the LPT rules.  相似文献   
73.
This paper is a note on “Complexity analysis of job-shop scheduling with deteriorating jobs” [G. Mosheiov, Complexity analysis of job-shop scheduling with deteriorating jobs, Discrete Applied Mathematics 117 (2002) 195-209]. A proportional deterioration rate is assumed and the objective is the minimization of the makespan. Mosheiov presents NP-hardness results for flow-shops and open-shops with three or more machines and for job-shops with two or more machines. The proof of NP-hardness for the flow-shop case is however not correct. This paper provides a correct proof.  相似文献   
74.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号