排序方式: 共有49条查询结果,搜索用时 15 毫秒
21.
对电子电路实验中几种较典型的电磁干扰以及与之相应的抗干扰技术进行了具体分析和研究,通过分析指出接地和屏蔽等抗干扰技术在各种电路中的使用原则,并给出两个抗干扰技术实例。 相似文献
22.
Twelve very low Beta superconducting single spoke cavities, whose Beta is only 0.12 (Spoke012) when operating at 325 MHz, are adopted in Injector I for China-ADS linac. This type of spoke cavity is believed to be one of the key challenges for its very low geometric Beta. So far, in collaboration with Peking University and Harbin Institute of Technology, IHEP has successfully designed, fabricated, and tested the Spoke012 prototype cavity. This paper presents the details of the design, fabrication and test results for Spoke012 prototype cavity. 相似文献
23.
24.
25.
在抗生素JI - 2 0A分批发酵过程中 ,对数生长期最大 μx 可达 0 .0 5 8h- 1 ,最大Qst 约 3.91mg (mL·h) ,最大Es 为 2 2 .6 9U ;产物合成期Qp 最大可达 5 9.19μg (mL·h) ,μx ≤ 0 .0 2 2h- 1 ,Qst 约 0 .8~ 1.6mg (mL·h) .分别建立了菌体生长阶段和产物合成阶段的动力学模型 ,进行了模型参数的估计和回归 ,模型拟合偏差平方和≤ 5 %. 相似文献
26.
米正辉 孙毅 王光伟 潘卫民 李中泉 戴建枰 马强 林海英 刘亚萍 徐波 黄泓 王群要 许玉芬 赵光远 黄彤明 沙鹏 孟繁博 邱丰 李菡 陈旭 赵丹阳 张娟 《中国物理 C》2012,(10):996-999
The horizontal test for the BEPC 500 MHz spare cavity has been completed at IHEP. The maximum voltage of the cavity reached 2.17 MV, while Q 0 was 5.78 × 108 . The process and results of the high power horizontal test are presented and discussed in this paper. 相似文献
27.
北京正负电子对撞机二期(BEPCⅡ),国产500 MHz超导腔经过紧张的安装调试于2017年10月正式投入带束流运行。首先对此国产超导腔两次降温调试的相关参数进行了监测和对比分析;其次研究了通过高功率老练的方法改善超导腔的品质因数,并实时监测超导腔老练过程中的辐射剂量;最后对超导腔的带束流运行情况进行了介绍分析。结果表明:BEPCⅡ国产500 MHz超导腔虽然放置了6年,但是状态良好,通过高功率老练能够降低超导腔的辐射剂量,改善其性能,完全满足束流运行要求。 相似文献
28.
米正辉 孙毅 潘卫民 王光伟 李中泉 戴建枰 马强 林海英 徐波 黄泓 王群要 许玉芬 赵光远 黄彤明 沙鹏 张新颖 孟繁博 李菡 陈旭 赵丹阳 张娟 彭应华 《中国物理 C》2013,(8):70-74
The tuning system plays a very important role when a superconducting cavity is in operation. It cooperates with other control loops to adjust the cavity frequency with high precision, reduce the reflection power, guarantee the stability of beam, and ensure the safety of the superconducting cavity. This paper focuses mainly on the tuning system working principle, the working state and problems that Beijing Electron Positron Collider (BEPC ) has encountered during operation. 相似文献
29.
To test and verify the performance of the digital low-level radio-frequency (LLRF) and tuner system designed by the IHEP RF group, an experimental platform with a retired KEK 1.3 GHz nine-cell cavity is set up. A radio-frequency (RF) field is established successfully in the cavity and the frequency of the cavity is locked by the tuner in ±0.5° (about ±1.2 kHz) at room temperature. The digital LLRF system performs well in a five-hour experiment, and the results show that the system achieves field stability at amplitude <0.1% (peak to peak) and phase <0.1° (peak to peak). This index satisfies the requirements of the International Linear Collider (ILC), and this paper describes this closed-loop experiment of the LLRF system. 相似文献
30.
市政工程施工全过程管理,包含工程的招投标、合同的签订、施工前的准备、施工阶段的管理、工程的竣工验收及移交、工程总结等。 相似文献