排序方式: 共有152条查询结果,搜索用时 515 毫秒
91.
92.
为了提高注入束流的积累,抑制由于注入系统误差引起较大的β残余振荡是非常有必要的。较系统地介绍了利用合肥光源逐圈测量(turn by turn)系统[1],研究束流不稳定性,并给出了抑制注入β振荡的反馈系统设计原理和线路及初步实验结果。作为原理论证和预研,使用了一个相对简单的模拟滤波移相器对Kicker过程激发的β振荡进行反馈,得到了明显的对damping时间和振荡幅度的抑制作用,为以后低频和高频逐束团(bunch by bunch) 反馈系统研制和抑制束流的横向和纵向不稳定性的研究打下了良好的基础。 相似文献
93.
94.
In China, polymer radiation processing has become one of the most important processing industries. The radiation processing source may be an electron beam accelerator or a radioactive source. Physical design of an electron beam facility applied for radiation crosslinking is introduced in this paper because of it’s much higher dose rate and efficiency. Main part of this facility is a 10 MeV travelling wave electron linac with constant impedance accelerating structure. A start to end simulation concerning the linac is reported in this paper. The codes Opera-3d, Poisson-superfish and Parmela are used to describe electromagnetic elements of the accelerator and track particle distribution from the cathode to the end of the linac. After beam dynamic optimization, wave phase velocities in the structure have been chosen to be 0.56, 0.9 and 0.999 respectively. Physical parameters about the main elements such as DC electron gun, iris-loaded periodic structure, solenoids, etc, are presented. Simulation results proves that it can satisfy the industrial requirement. The linac is under construction. Some components have been finished. Measurements proved that they are in a good agreement with the design values. 相似文献
95.
96.
97.
98.
99.
主要介绍了合肥光源储存环上,正在应用和改进中的逐圈测量系统的定标和灵敏度;比较和分析了利用该系统获得的储存环200MeV 和 800MeV damping时间测量结果;在环注入调试中发现了束流积累限制的原因。它不仅可测到储存环的damping时间、beta振荡幅度和工作点瞬时变化,而且是研究抑制环的束流不稳定性和提高注入积累效率的重要测量手段。系统使用对数比电路完成位置信号处理,具有宽的动态范围和带宽以及好的线性度和稳定的运行性能,而且造价低廉,易实现。 相似文献
100.