首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper considers the two-parallel machines scheduling problem with rate-modifying activities. In this model, each machine has a rate-modifying activity that can change the processing rate of machine under consideration. Hence the actual processing times of jobs vary depending on whether the job is scheduled before or after the rate-modifying activity. We need to make a decision on when to schedule the rate-modifying activities and the sequence of jobs to minimize some objective function. We provide polynomial and pseudo-polynomial time algorithms to solve the total completion time minimization problem and total weighted completion time minimization problem under agreeable ratio condition.  相似文献   

2.
We consider the parallel-machine scheduling problem in which the processing time of a job is a simple linear increasing function of its starting time. The objective is to minimize the total completion time. We give a fully polynomial-time approximation scheme (FPTAS) for the case with m identical machines, where m is fixed. This study solves an open problem that has been posed in the literature for ten years.  相似文献   

3.
考虑工件可自由下线最小化总完工时间的有界平行分批排序问题. 在该问题中, 一台平行批机器可以同时处理 b 个工件作为一个平行批, 这里b 是批容量, 一个批的加工时间等于分配给这个批的工件的最大加工时间. 关于可自由下线工件, 每一个工件的完工时间等于包含这个工件的批的开工时间与工件的加工时间的和. 也就是, 如果一个批B 有一个开工时间S, 那么包含在批B 中的每一个工件J_j 的开工时间定义为S, 而它的完工时间定义为S+p_j, 这里p_j 是工件J_j 的加工时间. 对此问题, 首先研究最优排序的一些性质. 然后, 基于这些性质, 给出一个运行时间为O(n^{b (b-1)})的动态规划算法.  相似文献   

4.
Baker and Nuttle [K.R. Baker, H.L.W. Nuttle, Sequencing independent jobs with a single resource, Naval Research Logistics Quarterly 27 (1980) 499–510] studied the following single-variable-resource scheduling problem: sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. When the objective function to be minimized is the total weighted completion time, Baker and Nuttle conjectured that the problem is NP-hard. We show in this note that the conjecture is true.  相似文献   

5.
We consider the single machine scheduling problem to minimize total completion time with fixed jobs, precedence constraints and release dates. There are some jobs that are already fixed in the schedule. The remaining jobs are free to be assigned to any free-time intervals on the machine in such a way that they do not overlap with the fixed jobs. Each free job has a release date, and the order of processing the free jobs is restricted by the given precedence constraints. The objective is to minimize the total completion time. This problem is strongly NP-hard. Approximability of this problem is studied in this paper. When the jobs are processed without preemption, we show that the problem has a linear-time n-approximation algorithm, but no pseudopolynomial-time (1 − δ)n-approximation algorithm exists even if all the release dates are zero, for any constant δ > 0, if P ≠ NP, where n is the number of jobs; for the case that the jobs have no precedence constraints and no release dates, we show that the problem has no pseudopolynomial-time (2 − δ)-approximation algorithm, for any constant δ > 0, if P ≠ NP, and for the weighted version, we show that the problem has no polynomial-time 2q(n)-approximation algorithm and no pseudopolynomial-time q(n)-approximation algorithm, where q(n) is any given polynomial of n. When preemption is allowed, we show that the problem with independent jobs can be solved in O(n log n) time with distinct release dates, but the weighted version is strongly NP-hard even with no release dates; the problems with weighted independent jobs or with jobs under precedence constraints are shown having polynomial-time n-approximation algorithms. We also establish the relationship of the approximability between the fixed job scheduling problem and the bin-packing problem.  相似文献   

6.
We consider the scheduling problem of minimizing the average-weighted completion time on identical parallel machines when jobs are arriving over time. For both the preemptive and the nonpreemptive setting, we show that straightforward extensions of Smith's ratio rule yield smaller competitive ratios than the previously best-known deterministic on-line algorithms.  相似文献   

7.
We study a problem of scheduling n jobs on a single machine in batches. A batch is a set of jobs processed contiguously and completed together when the processing of all jobs in the batch is finished. Processing of a batch requires a machine setup time dependent on the position of this batch in the batch sequence. Setup times and job processing times are continuously controllable, that is, they are real-valued variables within their lower and upper bounds. A deviation of a setup time or job processing time from its upper bound is called a compression. The problem is to find a job sequence, its partition into batches, and the values for setup times and job processing times such that (a) total job completion time is minimized, subject to an upper bound on total weighted setup time and job processing time compression, or (b) a linear combination of total job completion time, total setup time compression, and total job processing time compression is minimized. Properties of optimal solutions are established. If the lower and upper bounds on job processing times can be similarly ordered or the job sequence is fixed, then O(n3 log n) and O(n5) time algorithms are developed to solve cases (a) and (b), respectively. If all job processing times are fixed or all setup times are fixed, then more efficient algorithms can be devised to solve the problems.  相似文献   

8.
Wang et al. (J Operat Res Soc 62: 1898–1902, 2011) studied the m identical parallel-machine and unrelated parallel-machine scheduling with a deteriorating maintenance activity to minimize the total completion time. They showed that each problem can be solved in O(n 2m+3) time, where n is the number of jobs. In this note, we discuss the unrelated parallel-machine setting and show that the problem can be optimally solved by a lower order algorithm.  相似文献   

9.
We consider the problem of scheduling multi-operation jobs on a singe machine to minimize the total completion time. Each job consists of several operations that belong to different families. In a schedule each family of job operations may be processed as batches with each batch incurring a set-up time. A job is completed when all of its operations have been processed. We first show that the problem is strongly NP-hard even when the set-up times are common and each operation is not missing. When the operations have identical processing times and either the maximum set-up time is sufficiently small or the minimum set-up time is sufficiently large, the problem can be solved in polynomial time. We then consider the problem under the job-batch restriction in which the operations of each batch is partitioned into operation batches according to a partition of the jobs. We show that this case of the problem can be solved in polynomial time under a certain condition.  相似文献   

10.
The flowshop scheduling problems with n jobs processed on two or three machines, and with two jobs processed on k machines are addressed where jobs have random and bounded processing times. The probability distributions of random processing times are unknown, and only the lower and upper bounds of processing times are given before scheduling. In such cases, there may not exist a unique schedule that remains optimal for all feasible realizations of the processing times, and therefore, a set of schedules has to be considered which dominates all other schedules for the given criterion. We obtain sufficient conditions when transposition of two jobs minimizes total completion time for the cases of two and three machines. The geometrical approach is utilized for flowshop problem with two jobs and k machines.  相似文献   

11.
In this paper, we address the three-machine flowshop scheduling problem. Setup times are considered separate from processing times, and the objective is to minimize total completion time. We show that the three-site distributed database scheduling problem can be modeled as a three-machine flowshop scheduling problem. A lower bound is developed and a dominance relation is established. Moreover, an upper bound is developed by using a three-phase hybrid heuristic algorithm. Furthermore, a branch-and-bound algorithm, incorporating the developed lower bound, dominance relation, and the upper bound is presented. Computational analysis on randomly generated problems is conducted to evaluate the lower and upper bounds, the dominance relation, and the branch-and-bound algorithm. The analysis shows the efficiency of the upper bound, and, hence, it can be used for larger size problems as a heuristic algorithm.  相似文献   

12.
13.
Bicriteria scheduling problems are of significance in both theoretical and applied aspects. It is known that the single machine bicriteria scheduling problem of minimizing total weighted completion time and maximum cost simultaneously is strongly NP-hard. In this paper we consider a special case where the jobs have equal length and present an $O(n^{3}\log n)$ algorithm for finding all Pareto optimal solutions of this bicriteria scheduling problem.  相似文献   

14.
This paper deals with a single machine scheduling problem with start time dependent job processing times. The job processing times are characterized by decreasing linear functions dependent on their start times. The problem is to find a schedule for which the total weighted completion time is minimized. It is proved that the problem is NP-hard. Some properties of special cases of the general problem are also given. Based on these results, two heuristic algorithms are constructed and their performance is compared.  相似文献   

15.
16.
This paper explores scheduling a realistic variant of open shops with parallel machines per working stage. Since real production floors seldom employ a single machine for each operation, the regular open shop problem is very often in practice extended with a set of parallel machines at each stage. The purpose of duplicating machines in parallel is to either eliminate or to reduce the impact of bottleneck stages on the overall shop efficiency. The objective is to find the sequence which minimizes total completion times of jobs. We first formulate the problem as an effective mixed integer linear programming model, and then we employ memetic algorithms to solve the problem. We employ Taguchi method to evaluate the effects of different operators and parameters on the performance of memetic algorithm. To further enhance the memetic algorithm, we hybridize it with a simple form of simulated annealing as its local search engine. To assess the performance of the model and algorithms, we establish two computational experiments. The first one is small-sized instances by which the model and general performance of the algorithms are evaluated. The second one consists of large-sized instances by which we further evaluate the algorithms.  相似文献   

17.
We consider a scheduling problem in which n jobs with distinct deadlines are to be scheduled on a single machine. The objective is to find a feasible job sequence that minimizes the total weighted completion time. We present an efficient branch-and-bound algorithm that fully exploits the principle of optimality. Favorable numerical results are also reported on an extensive set of problem instances of 20-120 jobs.  相似文献   

18.
We consider the problem of scheduling orders for multiple different product types in an environment with m dedicated machines in parallel. The objective is to minimize the total weighted completion time. Each product type is produced by one and only one of the m dedicated machines; that is, each machine is dedicated to a specific product type. Each order has a weight and may also have a release date. Each order asks for certain amounts of various different product types. The different products for an order can be produced concurrently. Preemptions are not allowed. Even when all orders are available at time 0, the problem has been shown to be strongly NP-hard for any fixed number (?2) of machines. This paper focuses on the design and analysis of efficient heuristics for the case without release dates. Occasionally, however, we extend our results to the case with release dates. The heuristics considered include some that have already been proposed in the literature as well as several new ones. They include various static and dynamic priority rules as well as two more sophisticated LP-based algorithms. We analyze the performance bounds of the priority rules and of the algorithms and present also an in-depth comparative analysis of the various rules and algorithms. The conclusions from this empirical analysis provide insights into the trade-offs with regard to solution quality, speed, and memory space.  相似文献   

19.
In this paper, we consider the problem of scheduling n jobs on m machines in an open shop environment so that the sum of completion times or mean flow time becomes minimal. For this strongly NP-hard problem, we develop and discuss different constructive heuristic algorithms. Extensive computational results are presented for problems with up to 50 jobs and 50 machines, respectively. The quality of the solutions is evaluated by a lower bound for the corresponding preemptive open shop problem and by an alternative estimate of mean flow time. We observe that the recommendation of an appropriate constructive algorithm strongly depends on the ratio n/m.  相似文献   

20.
In this paper, we consider the single-machine scheduling problems with a time-dependent deterioration. By the time-dependent deterioration, we mean that the processing time of a job is defined by an increasing function of total normal processing time of jobs in front of it in the sequence. The objective is to minimize the total completion time. We develop a mixed integer programming formulation for the problem. The complexity status of this problem remains open. Hence, we use the smallest normal processing time (SPT) first rule as a heuristic algorithm for the general cases and analyze its worst-case error bound. Two heuristic algorithms utilize the V-shaped property are also proposed to solve the problem. Computational results are presented to evaluate the performance of the proposed algorithms.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号