首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 312 毫秒
1.
A graph is 2K2-partitionable if its vertex set can be partitioned into four nonempty parts A, B, C, D such that each vertex of A is adjacent to each vertex of B, and each vertex of C is adjacent to each vertex of D. Determining whether an arbitrary graph is 2K2-partitionable is the only vertex-set partition problem into four nonempty parts according to external constraints whose computational complexity is open. We show that for C4-free graphs, circular-arc graphs, spiders, P4-sparse graphs, and bipartite graphs the 2K2-partition problem can be solved in polynomial time.  相似文献   

2.
Packing coloring is a partitioning of the vertex set of a graph with the property that vertices in the i-th class have pairwise distance greater than i. The main result of this paper is a solution of an open problem of Goddard et al. showing that the decision whether a tree allows a packing coloring with at most k classes is NP-complete.We further discuss specific cases when this problem allows an efficient algorithm. Namely, we show that it is decideable in polynomial time for graphs of bounded treewidth and diameter, and fixed parameter tractable for chordal graphs.We accompany these results by several observations on a closely related variant of the packing coloring problem, where the lower bounds on the distances between vertices inside color classes are determined by an infinite nondecreasing sequence of bounded integers.  相似文献   

3.
The problem of arbitrary decomposition of a graph G into closed trails i.e. a decomposition into closed trails of prescribed lengths summing up to the size of the graph G was first considered in the case of the complete graph G=Kn (for odd n) in connection with vertex-distinguishing coloring of the union of cycles.Next, the same problem was investigated for other families of graphs.In this paper we consider a more general problem: arbitrary decomposition of a graph into open and closed trails. Our results are based on and generalize known results on decomposition of a graph into closed trails. Our results also generalize some results concerning decomposition of a graph into open trails. We here emphasize that the known results on the closed case are basic ingredients for the proof of the open and closed case.  相似文献   

4.
Let H be an arbitrary graph and let K1,2 be the 2-edge star. By a {K1,2,H}-decomposition of a graph G we mean a partition of the edge set of G into subsets inducing subgraphs isomorphic to K1,2 or H. Let J be an arbitrary connected graph of odd size. We show that the problem to decide if an instance graph G has a {K1,2,H}-decomposition is NP-complete if H has a component of an odd size and HpK1,2qJ, where pK1,2qJ is the disjoint union of p copies of K1,2 and q copies of J. Moreover, we prove polynomiality of this problem for H=qJ.  相似文献   

5.
In this paper problems of time-dependent scheduling on dedicated machines are considered. The processing time of each job is described by a function which is dependent on the starting time of the job. The objective is to minimise the maximum completion time (makespan). We prove that under linear deterioration the two-machine flow shop problem is strongly NP-hard and the two-machine open shop problem is ordinarily NP-hard. We show that for the three-machine flow shop and simple linear deterioration there does not exist a polynomial-time approximation algorithm with the worst case ratio bounded by a constant, unless P=NP. We also prove that the three-machine open shop problem with simple linear deterioration is ordinarily NP-hard, even if the jobs have got equal deterioration rates on the third machine.  相似文献   

6.
We consider a scheduling problem with two identical parallel machines and n jobs. For each job we are given its release date when job becomes available for processing. All jobs have equal processing times. Preemptions are allowed. There are precedence constraints between jobs which are given by a (di)graph consisting of a set of outtrees and a number of isolated vertices. The objective is to find a schedule minimizing mean flow time. We suggest an O(n2) algorithm to solve this problem.The suggested algorithm also can be used to solve the related two-machine open shop problem with integer release dates, unit processing times and analogous precedence constraints.  相似文献   

7.
We consider a generalization of the classical open shop and flow shop scheduling problems where the jobs are located at the vertices of an undirected graph and the machines, initially located at the same vertex, have to travel along the graph to process the jobs. The objective is to minimize the makespan. In the tour-version the makespan means the time by which each machine has processed all jobs and returned to the initial location. While in the path-version the makespan represents the maximum completion time of the jobs. We present improved approximation algorithms for various cases of the open shop problem on a general graph, and the tour-version of the two-machine flow shop problem on a tree. Also, we prove that both versions of the latter problem are NP-hard, which answers an open question posed in the literature.  相似文献   

8.
9.
We consider the open shop scheduling problem with two machines. Each job consists of two operations, and it is prescribed that the first (second) operation has to be executed by the first (second) machine. The order in which the two operations are scheduled is not fixed, but their execution intervals cannot overlap. We are interested in the question whether, for two given values D1 and D2, there exists a feasible schedule such that the first and second machine process all jobs during the intervals [0,D1] and [0,D2], respectively.We formulate four simple conditions on D1 and D2, which can be verified in linear time. These conditions are necessary and sufficient for the existence of a feasible schedule. The proof of sufficiency is algorithmical, and yields a feasible schedule in linear time. Furthermore, we show that there are at most two non-dominated points (D1,D2) for which there exists a feasible schedule.  相似文献   

10.
In this paper, we consider the problem of scheduling n jobs on m machines in an open shop environment so that the sum of completion times or mean flow time becomes minimal. For this strongly NP-hard problem, we develop and discuss different constructive heuristic algorithms. Extensive computational results are presented for problems with up to 50 jobs and 50 machines, respectively. The quality of the solutions is evaluated by a lower bound for the corresponding preemptive open shop problem and by an alternative estimate of mean flow time. We observe that the recommendation of an appropriate constructive algorithm strongly depends on the ratio n/m.  相似文献   

11.
A simple graph G is k-ordered (respectively, k-ordered hamiltonian), if for any sequence of k distinct vertices v1,…,vkof G there exists a cycle (respectively, hamiltonian cycle) in G containing these k vertices in the specified order. In 1997 Ng and Schultz introduced these concepts of cycle orderability and posed the question of the existence of 3-regular 4-ordered (hamiltonian) graphs other than K4 and K3,3. Ng and Schultz observed that a 3-regular 4-ordered graph on more than 4 vertices is triangle free. We prove that a 3-regular 4-ordered graph G on more than 6 vertices is square free,and we show that the smallest graph that is triangle and square free, namely the Petersen graph, is 4-ordered. Furthermore, we prove that the smallest graph after K4 and K3,3 that is 3-regular 4-ordered hamiltonianis the Heawood graph. Finally, we construct an infinite family of 3-regular 4-ordered graphs.  相似文献   

12.
The star graph, as an interesting network topology, has been extensively studied in the past. In this paper, we address some of the combinatorial properties of the star graph. In particular, we consider the problem of calculating the surface area and volume of the star graph, and thus answering an open problem previously posed in the literature. The surface area of a sphere with radius i in a graph is the number of nodes in the graph whose distance from a given node is exactly i. The volume of a sphere with radius i in a graph is the number of nodes within distance i from the given node. In this paper, we derive explicit expressions to calculate the surface area and volume in the star graph.  相似文献   

13.
The problem of preemptively scheduling a set of n independent jobs on an m-machine open shop is studied, and two results are obtained. The first indicates that constructing optimal flow-time schedules is NP-hard for m larger than two. The second result shows that the problem remains NP-hard for the two-processor case when all jobs must be completed by their respective deadlines.  相似文献   

14.
We study a single-machine scheduling problem with periodic maintenance activity under two maintenance stratagems. Although the scheduling problem with single or periodic maintenance and nonresumable jobs has been well studied, most of past studies considered only one maintenance stratagem. This research deals with a single-machine scheduling problem where the machine should be stopped for maintenance after a fixed periodic interval (T) or after a fixed number of jobs (K) have been processed. The objective is to minimize the makespan for the addressed problem. A two-stage binary integer programming (BIP) model is provided for driving the optimal solution up to 350-job instances. For the large-sized problems, two efficient heuristics are provided for the different combinations of T and K. Computational results show that the proposed algorithm Best-Fit-Butterfly (BBF) performs well because the total average percentage error is below 1%. Once the constraint of the maximum number of jobs (K) processed in the machine’s available time interval (T) is equal or larger than half of jobs, the heuristic Best-Fit-Decreasing (DBF) is strongly recommended.  相似文献   

15.
The scheduling problems studied in this paper concern a two-machine no-wait flow shop problem with limited machine availability. In this model, we assume that machines may not always be available, for example because of preventive maintenance. We only consider the deterministic case where the unavailable periods are known in advance. The objective function considered is the maximum completion time (Cmax). We prove that the problem is NP-hard even if only one non-availability period occurs on one of machines, and NP-hard in the strong sense for arbitrary numbers of non-availability periods. We also provide heuristic algorithms with error bounding analysis.  相似文献   

16.
We prove that the vertex set of a K0-free weakly median graph G endowed with the weak topology associated with the geodesic convexity on V(G) is compact if and only if G has one of the following equivalent properties: (1) G contains no isometric rays; (2) any chain of interval of G ordered by inclusion is finite; (3) every self-contraction of G fixes a non-empty finite regular weakly median subgraph of G. We study the self-contractions of K0-free weakly median graphs which fix no finite set of vertices. We also follow a suggestion of Imrich and Klavzar [Product Graphs, Wiley, New York, 2000] by defining different centers of such a graph G, each of them giving rise to a non-empty finite regular weakly median subgraph of G which is fixed by all automorphisms of G.  相似文献   

17.
The paper surveys the complexity results for job shop, flow shop, open shop and mixed shop scheduling problems when the number n of jobs is fixed while the number r of operations per job is not restricted. In such cases, the asymptotical complexity of scheduling algorithms depends on the number m of machines for a flow shop and an open shop problem, and on the numbers m and r for a job shop problem. It is shown that almost all shop-scheduling problems with two jobs can be solved in polynomial time for any regular criterion, while those with three jobs are NP-hard. The only exceptions are the two-job, m-machine mixed shop problem without operation preemptions (which is NP-hard for any non-trivial regular criterion) and the n-job, m-machine open shop problem with allowed operation preemptions (which is polynomially solvable for minimizing makespan).  相似文献   

18.
Let H be a fixed graph. A graph G has an H-decomposition if the edge set of G can be partitioned into subsets inducing graphs isomorphic to H. Let PH denote the following decision problem: “Does an instance graph G admit H-decomposition?” In this paper we prove that the problem PH is polynomial time solvable if H is a graph whose every component has at most 2 edges. This way we complete a solution of Holyer’s problem which is the problem of classifying the problems PH according to their computational complexities.  相似文献   

19.
It is known that for the open shop scheduling problem to minimize the makespan there exists no polynomial-time heuristic algorithm that guarantees a worst-case performance ratio better than 5/4, unless P≠NP. However, this result holds only if the instance of the problem contains jobs consisting of at least three operations. This paper considers the open shop scheduling problem, provided that each job consists of at most two operations, one of which is to be processed on one of the m⩾2 machines, while the other operation must be performed on the bottleneck machine, the same for all jobs. For this NP-hard problem we present a heuristic algorithm and show that its worst-case performance ratio is 5/4.  相似文献   

20.
Let (G, <) be a finite graph G with a linearly ordered vertex set V. We consider the decision problem (G, <)ORD to have as an instance an (unordered) graph Γ and as a question whether there exists a linear order ≤ on V(Γ) and an order preserving graph isomorphism of (G, <) onto an induced subgraph of Γ. Several familiar classes of graph are characterized as the yes-instances of (G, < )ORD for appropriate choices of (G, <). Here the complexity of (G, <)ORD is investigated. We conjecture that for any 2-connected graph G, G ≠ Kk, (G, <)ORD is NP-complete. This is verified for almost all 2-connected graphs. Several related problems are formulated and discussed. © 1995 John Wiley & Sons, Inc.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号