首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
In this paper, we consider the problem of scheduling n jobs on m machines in an open shop environment so that the sum of completion times or mean flow time becomes minimal. For this strongly NP-hard problem, we develop and discuss different constructive heuristic algorithms. Extensive computational results are presented for problems with up to 50 jobs and 50 machines, respectively. The quality of the solutions is evaluated by a lower bound for the corresponding preemptive open shop problem and by an alternative estimate of mean flow time. We observe that the recommendation of an appropriate constructive algorithm strongly depends on the ratio n/m.  相似文献   

2.
《Applied Mathematical Modelling》2014,38(9-10):2490-2504
This paper studies the scheduling problem in hybrid flow shop (HFS) environment. The sequence dependent family setup time (SDFST) is concerned with minimization of makespan and total tardiness. Production environments in real world include innumerable cases of uncertainty and stochasticity of events and a suitable scheduling model should consider them. Hence, in this paper, due date is assumed to be uncertain and its data follow a normal distribution. Since the proposed problem is NP-hard, two metaheuristic algorithms are presented based on genetic algorithm, namely: Non-dominated Sorting Genetic Algorithm (NSGAII) and Multi Objective Genetic Algorithm (MOGA). The quantitative and qualitative results of these two algorithms have been compared in different dimensions with multi phase genetic algorithm (MPGA) used in literature review. Experimental results indicate that the NSGAII performs very well when compared against MOGA and MPGA in a considerably shorter time.  相似文献   

3.
针对延迟工件数最小的混合流水车间调度问题,给出了一种改进的模拟退火求解算法. 该算法首先给出一个启发式算法来获得初始解,然后用模拟退火算法对初始解改进. 通过交换工件在第一阶段的排序来获得一个新的解,采用最先空闲设备分配规则和先到先被加工规则,对工件在剩余各级的工序进行调度. 实验仿真表明算法是可行有效的.  相似文献   

4.
Genetics algorithms have been designed as general purpose optimisation methods. Simulated annealing simulates the cooling process of solid materials-known as annealing. However this analogy is limited to the physical movement of the molecules without involving complex thermodynamic systems. Physical annealing refers to the process of cooling a solid material so that it reaches a low energy state. Initially the solid is heated up to the melting point. Then it is cooled very slowly, allowing it is to come to thermal equilibrium at each temperature. This process of slow cooling is called annealing. The goal is to find the best arrangement of molecules that minimises the energy of the system, which is referred to as the ground state of the solid material. If the cooling process is fast, the solid will not attain the ground state, but a locally optimal structure. In this paper presents a general purpose schedule optimiser for manufacturing shop scheduling using genetic algorithms and simulated annealing. Then, the ‘uniform order-based’ crossover and mutation operators and novel general effects of parameter values on minimised objective value are presented.  相似文献   

5.
We consider a generalization of the classical open shop and flow shop scheduling problems where the jobs are located at the vertices of an undirected graph and the machines, initially located at the same vertex, have to travel along the graph to process the jobs. The objective is to minimize the makespan. In the tour-version the makespan means the time by which each machine has processed all jobs and returned to the initial location. While in the path-version the makespan represents the maximum completion time of the jobs. We present improved approximation algorithms for various cases of the open shop problem on a general graph, and the tour-version of the two-machine flow shop problem on a tree. Also, we prove that both versions of the latter problem are NP-hard, which answers an open question posed in the literature.  相似文献   

6.
In this paper a new mixed-integer linear programming (MILP) model is proposed for the multi-processor open shop scheduling (MPOS) problems to minimize the makespan with considering independent setup time and sequence dependent removal time. A hybrid imperialist competitive algorithm (ICA) with genetic algorithm (GA) is presented to solve this problem. The parameters of the proposed algorithm are tuned by response surface methodology (RSM). The performance of the algorithm to solve small, medium and large sized instances of the problem is evaluated by introducing two performance metrics. The quality of obtained solutions is compared with that of the optimal solutions for small sized instances and with the lower bounds for medium sized instances. Also some computational results are presented for large sized instances.  相似文献   

7.
8.
This paper describes a complex scheduling problem taken from a hospital diagnostic testing center that schedules hundreds of patients in an open shop environment consisting of multiple facilities and multiple processors. This scheduling problem, known as the multiprocessor open shop (MPOS) problem, is strongly NP-hard with few published results. Realizing that in many MPOS environments processing times are stage-dependent, not both job and stage-dependent, this paper examines a new class of problems for the MPOS—proportionate ones. This paper exploits the structural nature of the proportionate MPOS and defines new terms. Despite the enormous complexity of the MPOS problem, this work demonstrates that polynomial time algorithms exist for two special cases. Since other applications of this problem exist in service and manufacturing environments, solving the proportionate MPOS problem is not only significant in the theory of optimization, but also in many real-world applications.  相似文献   

9.
The m  -machine open shop problem to minimize the sum of the completion times is investigated in our paper. First, a heuristic algorithm, Shortest Processing Time Block, is presented to deal with problem Om|n=km|∑CjOm|n=km|Cj, where k   is positive integer. And then, the heuristic is extended to solve the general problem Om‖∑CjOmCj. It is proved that the heuristic is asymptotically optimal when the job number goes to infinity. At the end of this paper, numerical experimentation results show the effectiveness of the heuristic algorithm.  相似文献   

10.
The paper present a linear-time algorithm for solving the two machine open shop scheduling problem to minimize an arbitrary regular penalty function depending on the lengths of periods during which the machines are used. Both the preemptive and the nonpreemptive cases of the problem are considered.  相似文献   

11.
陈光亭  陈蕾  张安  陈永 《运筹学学报》2016,20(4):109-114
研究可转包的两台流水作业机排序问题, 目标是极小化最大完工时间和总外包费用之和. 首先给出最坏情况界为2的近似算法, 接着对工件满足有序化约束的情形给出最坏情况界为\frac{3}{2}的改进算法, 以上算法界均为紧界.  相似文献   

12.
This paper considers a scheduling problem in two-stage hybrid flow shop, where the first stage consists of two machines formed an open shop and the other stage has only one machine. The objective is to minimize the makespan, i.e., the maximum completion time of all jobs. We first show the problem is NP-hard in the strong sense, then we present two heuristics to solve the problem. Computational experiments show that the combined algorithm of the two heuristics performs well on randomly generated problem instances.  相似文献   

13.
This paper considers a coordinated scheduling problem. For the first-stage transportation there is a crane available to transport the product from the warehouse to a batching machine. For the second-stage transportation there is a vehicle available to deliver the completed jobs from the machine shop floor to the customer. The coordinated scheduling problem of production and transportation deals with sequencing the transportation of the jobs and combining them into batches to be processed. The problem of minimizing the sum of the makespan and the total setup cost was proven by Tang and Gong [1] to be strongly NP-hard. This paper proposes two genetic algorithm (GA) approaches for this scheduling problem, with different result representations. The experimental results demonstrate that a regular GA and a modified GA (MGA) can find near-optimal solutions within an acceptable amount of computational time. Among the two proposed metaheuristic approaches, the MGA is superior to the GA both in terms of computing time and the quality of the solution.  相似文献   

14.
This paper presents a genetic algorithm and a scatter search procedure to solve the well-known job shop scheduling problem. In contrast to the single population search performed by the genetic algorithm, the scatter search algorithm splits the population of solutions in a diverse and high-quality set to exchange information between individuals in a controlled way. The extension from a single to a dual population, by taking problem specific characteristics into account, can be seen as a stimulator to add diversity in the search process. This has a positive influence on the important balance between intensification and diversification. Computational experiments verify the benefit of this diversity on the effectiveness of the meta-heuristic search process. Various algorithmic parameters from literature are embedded in both procedures and a detailed comparison is made. A set of standard instances is used to compare the different approaches and the best obtained results are benchmarked against heuristic solutions found in literature.  相似文献   

15.
In this study, a general framework is proposed that combines the distinctive features of three well-known approaches: the adaptive memory programming, the simulated annealing, and the tabu search methods. Four variants of a heuristic based on this framework are developed and presented. The performance of the proposed methods is evaluated and compared with a conventional simulated annealing approach using benchmark problems for job shop scheduling. The unique feature of the proposed framework is the use of two short-term memories. The first memory temporarily prevents further changes in the configuration of a provisional solution by maintaining the presence of good elements of such solutions. The purpose of the second memory is to keep track of good solutions found during an iteration, so that the best of these can be used as the starting point in a subsequent iteration. Our computational results for the job shop scheduling problem clearly indicate that the proposed methods significantly outperform the conventional simulated annealing.  相似文献   

16.
In this paper, we address an n-job, single machine scheduling problem with an objective to minimize the flow time variance. We propose heuristic procedure based on genetic algorithms with the potential to address more generalized objective function such as weighted flow time variance. The development and implementation of the algorithm is supported with literature review and statistical analysis of the results. Some general guidelines to select the parameter values of the genetic algorithm are also developed using an experimental design approach.  相似文献   

17.
研究相同工件在两台机器(分别称为机器M1M2)上的混合流水作业问题,每个给定工件有两个任务,分别称之为任务A和任务B,任务B只能在任务A完工后才能开始加工,每个工件有两种加工模式供选择:模式1是将两个任务都安排在机器M2上加工;模式2是将任务A和B分别安排在机器M1M2上加工.假设在加工工件时,机器具有学习效应,即工件的实际加工时间与工件的加工位置有关.目标函数是最小化最大完工时间.分别讨论了具有无缓冲区与无限缓冲区两种加工环境情况,两种情况下都得到了最优算法.  相似文献   

18.
This paper involves the multi-mode project payment scheduling problem where the activities can be performed with one of several discrete modes and the objective is to assign activities’ modes and progress payments so as to maximize the net present value of the contractor under the constraint of project deadline. Using the event-based method the basic model of the problem is constructed and in terms of the different payment rules it is extended as the progress based, expense based, and time based models further. For the strong NP-hardness of the problem which is proven by simplifying it to the deadline subproblem of the discrete time–cost tradeoff problem, we develop two heuristic algorithms, namely simulated annealing and tabu search, to solve the problem. The two heuristic algorithms are compared with the multi-start iterative improvement method as well as random sampling on the basis of a computational experiment performed on a data set constructed by ProGen project generator. The results show that the proposed simulated annealing heuristic algorithm seems to be the most promising algorithm for solving the defined problem especially when the instances become larger. In addition, the effects of several key parameters on the net present value of the contractor are analyzed and some conclusions are given based on the results of the computational experiment.  相似文献   

19.
蔡爽  杨珂  刘克 《运筹学学报》2018,22(4):17-30
考虑具有机器适用限制的多个不同置换流水车间的调度问题. 机器适用限制指的是每个工件只能分配到其可加工工厂集合. 所有置换流水车间拥有的机器数相同但是具有不同的加工能力. 首先, 针对该问题建立了基于位置的混合整数线性规划模型; 进而, 对一般情况和三种特殊情况给出了具有较小近似比的多项式时间算法. 其次, 基于NEH方法提出了启发式算法NEHg, 并给出了以NEHg为上界的分支定界算法. 最后, 通过例子说明了NEHg启发式算法和分支定界算法的计算过程, 并进行大量的实验将NEHg与NEH算法结果进行比较, 从而验证了NEHg算法的有效性.  相似文献   

20.
A comparison of local search methods for flow shop scheduling   总被引:1,自引:0,他引:1  
Local search techniques are widely used to obtain approximate solutions to a variety of combinatorial optimization problems. Two important categories of local search methods are neighbourhood search and genetic algorithms. Commonly used neighbourhood search methods include descent, threshold accepting, simulated annealing and tabu search. In this paper, we present a computational study that compares these four neighbourhood search methods, a genetic algorithm, and a hybrid method in which descent is incorporated into the genetic algorithm. The performance of these six local search methods is evaluated on the problem of scheduling jobs in a permutation flow shop to minimize the total weighted completion time. Based on the results of extensive computational tests, simulated annealing is found to generate better quality solutions than the other neighborhood search methods. However, the results also indicate that the hybrid genetic descent algorithm is superior to simulated annealing.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号